Posted to dev@struts.apache.org by James Holmes <ja...@jamesholmes.com> on 2007/08/14 15:20:39 UTC

[s2] 2.0.10 release - when?

Since the 2.0.X releases are small point releases, I'm all for releasing 2.0.10
soon. I'd like to see a regular schedule for these releases so we can keep fixing
the minor issues and getting these fixes out to the users. This will help Struts
2 attract new users. It seems 2.1 is still a ways out (although I'd like to see
us put some scope around that and make a rough estimate of a goal when we'd like
to get it out).

My vote is to release 2.0.10 with the WW-2107 security fix instead of doing a
special security fix release. I think we can wait the normal 72 hours that a
"regular" release requires.

Thoughts?

That said, we need a release manager. I'm happy to work on bugs, but don't have
time to pour into learning all of the release steps and setting up the required
infrastructure on my machine right now.

James



---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscribe@struts.apache.org
For additional commands, e-mail: dev-help@struts.apache.org


Re: [s2] 2.0.10 release - when?

Posted by Ted Husted <hu...@apache.org>.
The other thing that might help speed up the process would be to
follow up on the Selenium tests that Martin Gilday started

* http://www.nabble.com/Release-process-and-release-Maven-plugin-%28WAS%3A-Re%3A-Voting-Process-%28was-Re%3A-Struts-2.0.9-release-%28WAS%3A-Re%3A-S2-security-fix-release-planning-%28XWork-2.0.4-is-out%29%29%29%29-tf4164719.html#a11934860

Actually testing the Showcase UI is a *huge* time sink.

-T.

On 8/14/07, Ted Husted <hu...@apache.org> wrote:
> The best way to put us in a position of regular releases is to attend
> to the JIRA tickets, update the release notes, and test the
> applications as often as possible. Any committer can do that as time
> allows, without worrying about rolling a distribution.
>
> It's also not necessary for there to be a single release manager. In
> the past, we've often had one individual run point on the tickets,
> notes, and testing, and then have another roll the final distribution.
> In my experience, at least half of the work has nothing to do with
> rolling the distribution, but just getting the tickets, notes, and
> apps to the point where we can roll the distribution.
>
> If someone is about ready to clear the decks for a 2.0.10 build, then
> rushing out a 2.0.9.1 doesn't seem useful, since it would be
> superseded by 2.0.10 anyway. But, if it helps, I would be happy to
> roll either version at any time, if the tickets, notes, and testing
> are otherwise done.
>
> On 8/14/07, James Holmes <ja...@jamesholmes.com> wrote:
> > Since the 2.0.X releases are small point releases, I'm all for releasing 2.0.10
> > soon. I'd like to see a regular schedule for these releases so we can keep fixing
> > the minor issues and getting these fixes out to the users. This will help Struts
> > 2 attract new users. It seems 2.1 is still a ways out (although I'd like to see
> > us put some scope around that and make a rough estimate of a goal when we'd like
> > to get it out).
> >
> > My vote is to release 2.0.10 with the WW-2107 security fix instead of doing a
> > special security fix release. I think we can wait the normal 72 hours that a
> > "regular" release requires.
> >
> > Thoughts?
> >
> > That said, we need a release manager. I'm happy to work on bugs, but don't have
> > time to pour into learning all of the release steps and setting up the required
> > infrastructure on my machine right now.
> >
> > James

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscribe@struts.apache.org
For additional commands, e-mail: dev-help@struts.apache.org


Re: [s2] 2.0.10 release - when?

Posted by Ted Husted <hu...@apache.org>.
The best way to put us in a position of regular releases is to attend
to the JIRA tickets, update the release notes, and test the
applications as often as possible. Any committer can do that as time
allows, without worrying about rolling a distribution.

It's also not necessary for there to be a single release manager. In
the past, we've often had one individual run point on the tickets,
notes, and testing, and then have another roll the final distribution.
In my experience, at least half of the work has nothing to do with
rolling the distribution, but just getting the tickets, notes, and
apps to the point where we can roll the distribution.

If someone is about ready to clear the decks for a 2.0.10 build, then
rushing out a 2.0.9.1 doesn't seem useful, since it would be
superseded by 2.0.10 anyway. But, if it helps, I would be happy to
roll either version at any time, if the tickets, notes, and testing
are otherwise done.

On 8/14/07, James Holmes <ja...@jamesholmes.com> wrote:
> Since the 2.0.X releases are small point releases, I'm all for releasing 2.0.10
> soon. I'd like to see a regular schedule for these releases so we can keep fixing
> the minor issues and getting these fixes out to the users. This will help Struts
> 2 attract new users. It seems 2.1 is still a ways out (although I'd like to see
> us put some scope around that and make a rough estimate of a goal when we'd like
> to get it out).
>
> My vote is to release 2.0.10 with the WW-2107 security fix instead of doing a
> special security fix release. I think we can wait the normal 72 hours that a
> "regular" release requires.
>
> Thoughts?
>
> That said, we need a release manager. I'm happy to work on bugs, but don't have
> time to pour into learning all of the release steps and setting up the required
> infrastructure on my machine right now.
>
> James

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscribe@struts.apache.org