You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@phoenix.apache.org by "Chinmay Kulkarni (Jira)" <ji...@apache.org> on 2019/12/21 00:57:08 UTC
[jira] [Closed] (PHOENIX-5381) Increase
phoenix.task.handling.interval.ms to 10s for tests
[ https://issues.apache.org/jira/browse/PHOENIX-5381?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Chinmay Kulkarni closed PHOENIX-5381.
-------------------------------------
Bulk closing Jiras for the 4.15.0 release.
> Increase phoenix.task.handling.interval.ms to 10s for tests
> -----------------------------------------------------------
>
> Key: PHOENIX-5381
> URL: https://issues.apache.org/jira/browse/PHOENIX-5381
> Project: Phoenix
> Issue Type: Bug
> Reporter: Lars Hofhansl
> Assignee: Lars Hofhansl
> Priority: Major
> Fix For: 4.15.0, 5.1.0
>
> Attachments: 5381.txt
>
>
> BaseTests sets this 1000ms, and I see the logs filled the scans for new tasks.
> That produces more IO on the jenkins VMs and requires archiving much more data.
> There are only a few tests that do anything with tasks and those would slow down on average by 4.5 seconds.
> The production default is 1 minute, setting this to 10s for tests seems more sensible.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)