You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hive.apache.org by "Brock Noland (JIRA)" <ji...@apache.org> on 2013/11/01 16:31:17 UTC

[jira] [Updated] (HIVE-5708) PTest2 should trim long logs when posting to jira

     [ https://issues.apache.org/jira/browse/HIVE-5708?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Brock Noland updated HIVE-5708:
-------------------------------

       Resolution: Fixed
    Fix Version/s: 0.13.0
           Status: Resolved  (was: Patch Available)

Committed to trunk, thanks!!

> PTest2 should trim long logs when posting to jira
> -------------------------------------------------
>
>                 Key: HIVE-5708
>                 URL: https://issues.apache.org/jira/browse/HIVE-5708
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Brock Noland
>            Assignee: Brock Noland
>            Priority: Minor
>             Fix For: 0.13.0
>
>         Attachments: HIVE-5708.patch
>
>
> When a build fails we post the build log to JIRA. The issue is that sometimes this can be a couple hundred KB. Since this log is available in the link also mentioned in the JIRA we should trim the message size down to say *last* 200 lines and then add a warning when we need to.



--
This message was sent by Atlassian JIRA
(v6.1#6144)