You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@ace.apache.org by "Wilfried Sibla (JIRA)" <ji...@apache.org> on 2013/11/20 22:10:35 UTC
[jira] [Created] (ACE-433) New deployment needs two check cycles to
download and to install a new DP
Wilfried Sibla created ACE-433:
----------------------------------
Summary: New deployment needs two check cycles to download and to install a new DP
Key: ACE-433
URL: https://issues.apache.org/jira/browse/ACE-433
Project: ACE
Issue Type: Bug
Components: Management Agent
Affects Versions: 1.0.0
Reporter: Wilfried Sibla
Priority: Critical
I tested the new agent implementation but I observed a little bit curious behavior:
* At first check, the agent detects and downloads the update DP
* Then it stops with log entry: [DEBUG] 21:50:31 (downloads) Download stopped early: 926530 of -1 bytes downloaded... (0)
* on the next check: [DEBUG] 21:50:39 (controller) Checking for deployment updates..
* new DP is detected: [DEBUG] 21:50:39 (controller) Need to install update: newer deployment version available!
* Download is resumed: [INFO] 21:50:39 (controller) Download of deployment update is STOPPED. Resuming download...
* and completed: [DEBUG] 21:51:00 (downloads) Download completed: 926530 bytes downloaded...
This indicates that it needs to cycles to download and really install a DP.
--
This message was sent by Atlassian JIRA
(v6.1#6144)