You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Hadoop QA (JIRA)" <ji...@apache.org> on 2015/02/11 03:46:11 UTC
[jira] [Commented] (HBASE-13007) Fix the test timeouts being caused
by ChoreService
[ https://issues.apache.org/jira/browse/HBASE-13007?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14315470#comment-14315470 ]
Hadoop QA commented on HBASE-13007:
-----------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest attachment
http://issues.apache.org/jira/secure/attachment/12697902/HBASE-13007-v1.patch
against master branch at commit a7d93155f10184942ffc146f0694e5da83c78cd4.
ATTACHMENT ID: 12697902
{color:green}+1 @author{color}. The patch does not contain any @author tags.
{color:green}+1 tests included{color}. The patch appears to include 4 new or modified tests.
{color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings.
{color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings.
{color:green}+1 javadoc{color}. The javadoc tool did not generate any warning messages.
{color:green}+1 checkstyle{color}. The applied patch does not increase the total number of checkstyle errors
{color:green}+1 findbugs{color}. The patch does not introduce any new Findbugs (version 2.0.3) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings.
{color:green}+1 lineLengths{color}. The patch does not introduce lines longer than 100
{color:green}+1 site{color}. The mvn site goal succeeds with this patch.
{color:red}-1 core tests{color}. The patch failed these unit tests:
org.apache.hadoop.hbase.mapreduce.TestLoadIncrementalHFiles
org.apache.hadoop.hbase.master.TestDistributedLogSplitting
{color:red}-1 core zombie tests{color}. There are 1 zombie test(s): at org.apache.hadoop.hbase.coprocessor.TestMasterObserver.testRegionTransitionOperations(TestMasterObserver.java:1604)
Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//testReport/
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-protocol.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-hadoop-compat.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-thrift.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-server.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-common.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-hadoop2-compat.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-rest.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-examples.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-client.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-prefix-tree.html
Findbugs warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-annotations.html
Checkstyle Errors: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/checkstyle-aggregate.html
Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/12769//console
This message is automatically generated.
> Fix the test timeouts being caused by ChoreService
> ---------------------------------------------------
>
> Key: HBASE-13007
> URL: https://issues.apache.org/jira/browse/HBASE-13007
> Project: HBase
> Issue Type: Bug
> Reporter: Jonathan Lawlor
> Assignee: Jonathan Lawlor
> Attachments: HBASE-13007-v1.patch
>
>
> TestChoreService has been seen timing out in recent builds and the timeouts seem to be rooted in how the ChoreService cancels its chores when being shutdown. The issue is that during shutdown, the ChoreService calls synchronized methods on the ScheduledChore which could cause indefinite blocking if the scheduled chore is hanging in a synchronized method. We should instead call the appropriate cancel method within the ChoreService and add logic into ScheduledChores that allows them to realize when they have been cancelled.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)