You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ratis.apache.org by "Tsz-wo Sze (Jira)" <ji...@apache.org> on 2024/05/23 23:48:00 UTC
[jira] [Assigned] (RATIS-2100) The `closeFuture` never completed while closing from the `NEW` state.
[ https://issues.apache.org/jira/browse/RATIS-2100?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Tsz-wo Sze reassigned RATIS-2100:
---------------------------------
Assignee: Chung En Lee
> The `closeFuture` never completed while closing from the `NEW` state.
> ---------------------------------------------------------------------
>
> Key: RATIS-2100
> URL: https://issues.apache.org/jira/browse/RATIS-2100
> Project: Ratis
> Issue Type: Bug
> Reporter: Chung En Lee
> Assignee: Chung En Lee
> Priority: Critical
>
> Currently, the {{closeFuture}} only completes after the {{LogAppenderDaemon}} has started. However, when closing from the {{NEW}} state, the transition is {{NEW}} -> {{{}CLOSED{}}}, and the {{LogAppenderDaemon}} was not started.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)