You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@fineract.apache.org by "Santosh Math (JIRA)" <ji...@apache.org> on 2017/05/17 09:36:04 UTC
[jira] [Created] (FINERACT-465) Productive Collection Sheet is
throwing the error "Collection sheet can not be generated without meeting
date attached to any center", even though valid meeting date and staff is
assigned
Santosh Math created FINERACT-465:
-------------------------------------
Summary: Productive Collection Sheet is throwing the error "Collection sheet can not be generated without meeting date attached to any center", even though valid meeting date and staff is assigned
Key: FINERACT-465
URL: https://issues.apache.org/jira/browse/FINERACT-465
Project: Apache Fineract
Issue Type: Bug
Components: Loan
Reporter: Santosh Math
Assignee: Markus Geiss
1. Create a center with attached meeting date and staff.
2. Create a group under this center.
3. Create a client in this group.
4. Disburse a loan with matching meeting date of the center/group and also assign staff to the loan account.
5. Go to Collection Sheet and provide Office name, next meeting date(repayment falling on that date) and assigned staff and click on Productive collection sheet.
> Productive Collection Sheet is throwing the error "Collection sheet can not be generated without meeting date attached to any center", even though valid meeting date and staff is assigned
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)