You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@beam.apache.org by "Maximilian Michels (JIRA)" <ji...@apache.org> on 2019/02/06 14:21:00 UTC
[jira] [Created] (BEAM-6608) Flink Runner prepares to-be-staged
file too late
Maximilian Michels created BEAM-6608:
----------------------------------------
Summary: Flink Runner prepares to-be-staged file too late
Key: BEAM-6608
URL: https://issues.apache.org/jira/browse/BEAM-6608
Project: Beam
Issue Type: Bug
Components: runner-flink
Affects Versions: 2.10.0
Reporter: Maximilian Michels
Assignee: Maximilian Michels
Fix For: 2.11.0
Before execution, the Flink Runner prepares all necessary files, in order for them to be shipped to the remote cluster.
Due to a recent regression via BEAM-2873, the preparation is performed after the execution environment has been initialized. This skips the preparation phase and results in invalid files being shipped.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)