You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ambari.apache.org by "Oleg Nechiporenko (JIRA)" <ji...@apache.org> on 2015/02/27 18:28:06 UTC
[jira] [Reopened] (AMBARI-9774) Start and Test services at enable
security shows 100% even though its not completed
[ https://issues.apache.org/jira/browse/AMBARI-9774?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Oleg Nechiporenko reopened AMBARI-9774:
---------------------------------------
> Start and Test services at enable security shows 100% even though its not completed
> -----------------------------------------------------------------------------------
>
> Key: AMBARI-9774
> URL: https://issues.apache.org/jira/browse/AMBARI-9774
> Project: Ambari
> Issue Type: Bug
> Components: ambari-web
> Affects Versions: 2.0.0
> Reporter: Oleg Nechiporenko
> Assignee: Oleg Nechiporenko
> Priority: Critical
> Fix For: 2.0.0
>
> Attachments: 100.png, AMBARI-9774.patch, AMBARI-9774_branch-2.0.0.patch
>
>
> Deploy cluster with default configs for stack 2.2. Enable security by following the steps.
> At start and test services, even though the progress bar showed 100%, Complete button wasn't enabled. When navigated to the link 'Start and Test Services' noticed that Check Oozie was still in progress. Please take a look as this is an incorrect information shown.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)