You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@manifoldcf.apache.org by "Karl Wright (JIRA)" <ji...@apache.org> on 2014/02/04 19:36:11 UTC
[jira] [Created] (CONNECTORS-880) Under the right conditions, job
aborts do not update "last checked" time
Karl Wright created CONNECTORS-880:
--------------------------------------
Summary: Under the right conditions, job aborts do not update "last checked" time
Key: CONNECTORS-880
URL: https://issues.apache.org/jira/browse/CONNECTORS-880
Project: ManifoldCF
Issue Type: Bug
Components: Framework crawler agent
Affects Versions: ManifoldCF 1.4.1
Reporter: Karl Wright
Assignee: Karl Wright
Fix For: ManifoldCF 1.6
When a scheduled job is being considered to be started, MCF updates the last-check field ONLY if the job didn't start. It relies on the job's completion to set the last-check field in the case where the job does start. But if the job aborts, in at least one case the last-check field is NOT updated. This leads to the job being run over and over again within the schedule window.
--
This message was sent by Atlassian JIRA
(v6.1.5#6160)