You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Piotr Nowojski (Jira)" <ji...@apache.org> on 2019/09/26 12:13:00 UTC

[jira] [Assigned] (FLINK-14230) Change the endinput call of the downstream operator to after closing the upstream operator

     [ https://issues.apache.org/jira/browse/FLINK-14230?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Piotr Nowojski reassigned FLINK-14230:
--------------------------------------

    Assignee: Haibo Sun

>  Change the endinput call of the downstream operator to after closing the upstream operator
> -------------------------------------------------------------------------------------------
>
>                 Key: FLINK-14230
>                 URL: https://issues.apache.org/jira/browse/FLINK-14230
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Task
>            Reporter: Haibo Sun
>            Assignee: Haibo Sun
>            Priority: Major
>




--
This message was sent by Atlassian Jira
(v8.3.4#803005)