You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@ambari.apache.org by "Andrii Babiichuk (JIRA)" <ji...@apache.org> on 2015/05/12 14:21:00 UTC
[jira] [Updated] (AMBARI-11062) On Assign Masters page - components
are not correctly assigned to nodes in combo box on right side according to
components and respective nodes selected in drop down boxes on left
[ https://issues.apache.org/jira/browse/AMBARI-11062?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Andrii Babiichuk updated AMBARI-11062:
--------------------------------------
Attachment: AMBARI-11062.patch
> On Assign Masters page - components are not correctly assigned to nodes in combo box on right side according to components and respective nodes selected in drop down boxes on left
> -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
>
> Key: AMBARI-11062
> URL: https://issues.apache.org/jira/browse/AMBARI-11062
> Project: Ambari
> Issue Type: Bug
> Components: ambari-web
> Affects Versions: 2.1.0
> Reporter: Andrii Babiichuk
> Assignee: Andrii Babiichuk
> Priority: Blocker
> Fix For: 2.1.0
>
> Attachments: AMBARI-11062.patch
>
>
> On page Assign Masters Page,
> Choosing different node (than one suggested by ambari) for respective component does not update the combo box on right side.
> Somewhere session is taking all node information from boxes on right side but not from drop down boxes that user have made changes to.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)