You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kylin.apache.org by "Billy Liu (JIRA)" <ji...@apache.org> on 2017/08/13 13:13:00 UTC

[jira] [Updated] (KYLIN-2655) Fix wrong job duration issue when resuming the error or stopped job.

     [ https://issues.apache.org/jira/browse/KYLIN-2655?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Billy Liu updated KYLIN-2655:
-----------------------------
    Summary: Fix wrong job duration issue when resuming the error or stopped job.  (was: There are some minor problems with the duration of the job when resuming the error job or stopped job.)

> Fix wrong job duration issue when resuming the error or stopped job.
> --------------------------------------------------------------------
>
>                 Key: KYLIN-2655
>                 URL: https://issues.apache.org/jira/browse/KYLIN-2655
>             Project: Kylin
>          Issue Type: Bug
>    Affects Versions: v2.0.0
>            Reporter: peng.jianhua
>            Assignee: peng.jianhua
>            Priority: Minor
>              Labels: patch
>             Fix For: v2.1.0
>
>         Attachments: 0001-KYLIN-2655-There-are-some-minor-problems-with-the-du.patch
>
>
> 1.After the error job is resumed, the duration of the job is no longer changed until the job is finished.
> 2.Duration contains the time from job error to job resume, not the actual execution time.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)