You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Dave Barnes (Jira)" <ji...@apache.org> on 2021/01/21 22:08:00 UTC

[jira] [Updated] (GEODE-8866) User Guide - Update Cluster Config Tutorial "deploy" example

     [ https://issues.apache.org/jira/browse/GEODE-8866?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Dave Barnes updated GEODE-8866:
-------------------------------
    Priority: Minor  (was: Major)

> User Guide - Update Cluster Config Tutorial "deploy" example
> ------------------------------------------------------------
>
>                 Key: GEODE-8866
>                 URL: https://issues.apache.org/jira/browse/GEODE-8866
>             Project: Geode
>          Issue Type: Bug
>          Components: docs
>    Affects Versions: 1.13.1
>            Reporter: Dave Barnes
>            Priority: Minor
>
> On the Cluster config tutorial page, [https://geode.apache.org/docs/guide/113/configuring/cluster_config/persisting_configurations.html,] Step 6 shows a pair of gfsh deploy commands. The first one, at least, specifies an out-of-date version number for the deployed JAR file, so cutting and pasting the command results in an error.
> Update so cut-and-paste runs without errors.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)