[jira] [Updated] (MNG-5666) Divide build in pre-build, build and post-build

     [ https://issues.apache.org/jira/browse/MNG-5666?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Jason van Zyl updated MNG-5666:
-------------------------------
    Fix Version/s: 3.3.4
         Assignee: Jason van Zyl  (was: Robert Scholte)

> Divide build in pre-build, build and post-build
> -----------------------------------------------
>
>                 Key: MNG-5666
>                 URL: https://issues.apache.org/jira/browse/MNG-5666
>             Project: Maven
>          Issue Type: Sub-task
>          Components: FDPFC, Plugins and Lifecycle
>            Reporter: Robert Scholte
>            Assignee: Jason van Zyl
>             Fix For: 3.3.4
>
>
> Original proposal
> {quote}
> PROPOSAL 1: PerProject and PerPhase Executions
>  
> I've recently introduced the installAtEnd/deployAtEnd as an experimental feature which should improve the behavior of Maven without having to wait for the implementation in Maven Core, which would have a huge impact.
> The reason is that you only want to install and/or deploy only after all modules have been build and verified successfully.
> This feature works for most projects, however there are cases which cannot be solved by the plugin solution and require a change in the handling of lifecycles in Maven Core.
> Up unto the verify-phase you want to execute all phases per project, whereas the install and deploy should be executed per phase.
> Consider a root project with 2 modules, these should be executed like this
>  
> root   : validate ... verify
> module1: validate ... verify
> module2: validate ... verify
> root   : install
> module1: install
> module2: install
> root   : deploy
> module1: deploy
> module2: deploy
> {quote}
> After one of the google hangout session we came up with the following idea: divide the build in pre-build, build and post-build
> First the {{pre-build}} would do a validate of the whole project.
> The {{build}} runs from {{initialize}} up to {{verify}}
> The {{post-build}} would handle the distribution, being {{install}}/{{deploy}}



--