You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kylin.apache.org by "Guoliang Sun (Jira)" <ji...@apache.org> on 2023/01/05 09:21:00 UTC

[jira] [Assigned] (KYLIN-5349) Supports project-level configuration of concurrent task limits

     [ https://issues.apache.org/jira/browse/KYLIN-5349?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Guoliang Sun reassigned KYLIN-5349:
-----------------------------------

    Assignee: Guoliang Sun

> Supports project-level configuration of concurrent task limits
> --------------------------------------------------------------
>
>                 Key: KYLIN-5349
>                 URL: https://issues.apache.org/jira/browse/KYLIN-5349
>             Project: Kylin
>          Issue Type: Improvement
>    Affects Versions: 5.0-alpha
>            Reporter: Guoliang Sun
>            Assignee: Guoliang Sun
>            Priority: Major
>             Fix For: 5.0-alpha
>
>         Attachments: KYLIN-5349.pdf
>
>
> When the service contains multiple projects, different projects have different requirements for the number of concurrent tasks to be executed, for example, project A needs 5 concurrent tasks, project B supports 10 concurrent tasks. Currently, only parameters are available to control the same number of concurrency for each project at the system level, and it cannot support different concurrency requirements for different projects.
> {code:java}
> kylin.job.max-concurrent-jobs {code}
> Support for limiting concurrent tasks at the project level would help users better manage cluster resource usage.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)