You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "stack (JIRA)" <ji...@apache.org> on 2012/12/14 00:50:13 UTC
[jira] [Commented] (HBASE-7350) Flakey tests make CI unreliable
[ https://issues.apache.org/jira/browse/HBASE-7350?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13531654#comment-13531654 ]
stack commented on HBASE-7350:
------------------------------
Is this an experiment Nick? Not permanent right (lowering thread count)?
> Flakey tests make CI unreliable
> -------------------------------
>
> Key: HBASE-7350
> URL: https://issues.apache.org/jira/browse/HBASE-7350
> Project: HBase
> Issue Type: Bug
> Components: build
> Reporter: Nick Dimiduk
> Attachments: 7350-build-reduce-parallelism.0.diff, 7350-build-warn-on-terminate.0.diff
>
>
> Most PreCommit and PostCommit builds are failing these days. Keeping an eye on usual suspects reveals them to be mostly longer-running tests. Either the tests need to me made more rigorous or the erroneous Jenkins configuration needs addressed.
> The usual suspects:
> - org.apache.hadoop.hbase.client.TestMultiParallel
> - org.apache.hadoop.hbase.TestDrainingServer
> - org.apache.hadoop.hbase.regionserver.TestSplitTransaction
> - org.apache.hadoop.hbase.client.TestMultiParallel.testFlushCommitsNoAbort
> - org.apache.hadoop.hbase.replication.TestReplication
> - org.apache.hadoop.hbase.util.TestHBaseFsck
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira