You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@struts.apache.org by "Don Brown (JIRA)" <ji...@apache.org> on 2006/05/07 04:30:52 UTC

[jira] Created: (WW-1305) Synchronize Maven 2 build with Struts Action 1

Synchronize Maven 2 build with Struts Action 1
----------------------------------------------

         Key: WW-1305
         URL: http://issues.apache.org/struts/browse/WW-1305
     Project: Struts Action 2
        Type: New Feature

  Components: Misc  
    Reporter: Don Brown
 Assigned to: Don Brown 
     Fix For: 2.0


The Struts Action 2 Maven 2 build should be as similar as possible to the Struts Action 1 build.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
   http://issues.apache.org/struts/secure/Administrators.jspa
-
For more information on JIRA, see:
   http://www.atlassian.com/software/jira


[jira] Updated: (WW-1305) Synchronize Maven 2 build with Struts 1

Posted by "Wendy Smoak (JIRA)" <ji...@apache.org>.
     [ http://issues.apache.org/struts/browse/WW-1305?page=all ]

Wendy Smoak updated WW-1305:
----------------------------

        Summary: Synchronize Maven 2 build with Struts 1  (was: Synchronize Maven 2 build with Struts Action 1)
    Description: The Struts 2 Maven 2 build should be as similar as possible to the Struts 1 build.  (was: The Struts Action 2 Maven 2 build should be as similar as possible to the Struts Action 1 build.)

> Synchronize Maven 2 build with Struts 1
> ---------------------------------------
>
>                 Key: WW-1305
>                 URL: http://issues.apache.org/struts/browse/WW-1305
>             Project: Struts 2
>          Issue Type: New Feature
>          Components: Misc
>            Reporter: Don Brown
>         Assigned To: Don Brown
>             Fix For: 2.0.0
>
>
> The Struts 2 Maven 2 build should be as similar as possible to the Struts 1 build.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://issues.apache.org/struts/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

[jira] Resolved: (WW-1305) Synchronize Maven 2 build with Struts Action 1

Posted by "Don Brown (JIRA)" <ji...@apache.org>.
     [ http://issues.apache.org/struts/browse/WW-1305?page=all ]
     
Don Brown resolved WW-1305:
---------------------------

    Resolution: Fixed

I believe this has been accomplished, so I'm marking as resolved.

> Synchronize Maven 2 build with Struts Action 1
> ----------------------------------------------
>
>          Key: WW-1305
>          URL: http://issues.apache.org/struts/browse/WW-1305
>      Project: Struts Action 2
>         Type: New Feature

>   Components: Misc
>     Reporter: Don Brown
>     Assignee: Don Brown
>      Fix For: 2.0.0

>
> The Struts Action 2 Maven 2 build should be as similar as possible to the Struts Action 1 build.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
   http://issues.apache.org/struts/secure/Administrators.jspa
-
For more information on JIRA, see:
   http://www.atlassian.com/software/jira