You are viewing a plain text version of this content. The canonical link for it is here.
Posted to notifications@mynewt.apache.org by "William San Filippo (JIRA)" <ji...@apache.org> on 2017/07/11 17:25:00 UTC
[jira] [Created] (MYNEWT-810) Controller scheduler halts incorrect
state machine
William San Filippo created MYNEWT-810:
------------------------------------------
Summary: Controller scheduler halts incorrect state machine
Key: MYNEWT-810
URL: https://issues.apache.org/jira/browse/MYNEWT-810
Project: Mynewt
Issue Type: Bug
Security Level: Public (Viewable by anyone)
Components: Nimble
Affects Versions: v1_0_0_rel
Reporter: William San Filippo
Assignee: William San Filippo
Fix For: v1_1_0_rel
The scheduler incorrectly uses the schedule object argument when halting advertising if an advertising event is ongoing but a new scheduled event occurs (a connection, for example). This bug we causing a connection end event to get posted to the link layer task while the connection event was ongoing (messes up internal connection state machine timing).
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)