You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@kylin.apache.org by "Zhong,Jason (JIRA)" <ji...@apache.org> on 2016/11/07 06:15:58 UTC

[jira] [Resolved] (KYLIN-2090) Allow updating cube level config even the cube is ready

     [ https://issues.apache.org/jira/browse/KYLIN-2090?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Zhong,Jason resolved KYLIN-2090.
--------------------------------
       Resolution: Fixed
    Fix Version/s:     (was: Backlog)
                   v1.6.0

> Allow updating cube level config even the cube is ready
> -------------------------------------------------------
>
>                 Key: KYLIN-2090
>                 URL: https://issues.apache.org/jira/browse/KYLIN-2090
>             Project: Kylin
>          Issue Type: Improvement
>          Components: Web 
>            Reporter: Shaofeng SHI
>            Assignee: Zhong,Jason
>             Fix For: v1.6.0
>
>         Attachments: 0001-KYLIN-2090-Allow-updating-cube-level-config-even-the.patch
>
>
> Now once a Cube be built to "ready" state, user will not be able to update it, including changing the cube level configurations, this is bad; as sometimes user may want to add/change the config.
> It should be designed as the "Notification List": user can change at anytime, and it doesn't impact other things.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)