You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Haibo Sun (Jira)" <ji...@apache.org> on 2019/09/26 11:57:00 UTC
[jira] [Closed] (FLINK-14229) Change the endinput call of the
downstream operator to after the upstream operator closes
[ https://issues.apache.org/jira/browse/FLINK-14229?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Haibo Sun closed FLINK-14229.
-----------------------------
Resolution: Invalid
> Change the endinput call of the downstream operator to after the upstream operator closes
> ------------------------------------------------------------------------------------------
>
> Key: FLINK-14229
> URL: https://issues.apache.org/jira/browse/FLINK-14229
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Task
> Reporter: Haibo Sun
> Priority: Major
>
--
This message was sent by Atlassian Jira
(v8.3.4#803005)