You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Jimmy Xiang (JIRA)" <ji...@apache.org> on 2013/08/13 02:19:47 UTC
[jira] [Created] (HBASE-9199) Call duration is not accurate
Jimmy Xiang created HBASE-9199:
----------------------------------
Summary: Call duration is not accurate
Key: HBASE-9199
URL: https://issues.apache.org/jira/browse/HBASE-9199
Project: HBase
Issue Type: Bug
Reporter: Jimmy Xiang
Assignee: Jimmy Xiang
Priority: Minor
In RpcRetryingCaller, when calculating the call duration, the endTime is not updated yet, the current time should be used.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira