You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Weijie Guo (Jira)" <ji...@apache.org> on 2024/07/15 12:17:00 UTC
[jira] [Closed] (FLINK-31154) Build Release Candidate: 1.17.0-rc1
[ https://issues.apache.org/jira/browse/FLINK-31154?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Weijie Guo closed FLINK-31154.
------------------------------
Assignee: Weijie Guo (was: Jing Ge)
> Build Release Candidate: 1.17.0-rc1
> -----------------------------------
>
> Key: FLINK-31154
> URL: https://issues.apache.org/jira/browse/FLINK-31154
> Project: Flink
> Issue Type: New Feature
> Affects Versions: 1.17.0
> Reporter: Matthias Pohl
> Assignee: Weijie Guo
> Priority: Major
> Fix For: 1.17.0
>
>
> The core of the release process is the build-vote-fix cycle. Each cycle produces one release candidate. The Release Manager repeats this cycle until the community approves one release candidate, which is then finalized.
> h4. Prerequisites
> Set up a few environment variables to simplify Maven commands that follow. This identifies the release candidate being built. Start with {{RC_NUM}} equal to 1 and increment it for each candidate:
> {code}
> RC_NUM="1"
> TAG="release-${RELEASE_VERSION}-rc${RC_NUM}"
> {code}
--
This message was sent by Atlassian Jira
(v8.20.10#820010)