You are viewing a plain text version of this content. The canonical link for it is here.
Posted to hdfs-dev@hadoop.apache.org by "Kihwal Lee (JIRA)" <ji...@apache.org> on 2015/12/16 17:40:46 UTC

[jira] [Created] (HDFS-9561) PIpieline recovery near the end of a block may fail

Kihwal Lee created HDFS-9561:
--------------------------------

             Summary: PIpieline recovery near the end of a block may fail
                 Key: HDFS-9561
                 URL: https://issues.apache.org/jira/browse/HDFS-9561
             Project: Hadoop HDFS
          Issue Type: Bug
            Reporter: Kihwal Lee


When the client wants to add additional nodes to the pipeline during a recovery, it will fail if all existing replicas are already finalized.  This is because the partial block copy only works when the replica is in rbw.  Clients cannot reliably tell whether a node has finalized the replica during a recovery.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)