You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@oozie.apache.org by "Bowen Zhang (JIRA)" <ji...@apache.org> on 2013/10/03 03:55:41 UTC
[jira] [Updated] (OOZIE-1306) add flexibility to oozie coordinator
job scheduling
[ https://issues.apache.org/jira/browse/OOZIE-1306?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Bowen Zhang updated OOZIE-1306:
-------------------------------
Attachment: oozie-1306.patch
> add flexibility to oozie coordinator job scheduling
> ---------------------------------------------------
>
> Key: OOZIE-1306
> URL: https://issues.apache.org/jira/browse/OOZIE-1306
> Project: Oozie
> Issue Type: New Feature
> Reporter: Bowen Zhang
> Assignee: Bowen Zhang
> Attachments: oozie-1306.patch, oozie-1306.patch, oozie-1306.patch, oozie-1306.patch, oozie-1306-svn.patch, ooziecronschedulingdesigndoc.pdf
>
>
> Right now, to have a job that runs everyday from 9-5pm, we need to schedule 8 identical daily coordinator job, each of which starts at one particular hour; To have a job that runs from Monday through Friday, we need 5 identical weekly jobs with different start time. This ticket aims to solve this inconvenience.
--
This message was sent by Atlassian JIRA
(v6.1#6144)