Posted to issues@hbase.apache.org by "stack (JIRA)" <ji...@apache.org> on 2018/06/28 04:34:00 UTC

[jira] [Commented] (HBASE-20796) STUCK RIT though region successfully assigned

    [ https://issues.apache.org/jira/browse/HBASE-20796?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16525903#comment-16525903 ] 

stack commented on HBASE-20796:
-------------------------------

In short the issue is that handleFailure is called twice, once by SCP cleaning up stuck procedures and then much later, after the assign restarts and succeeds against another server, when the rpc to the crashed server throws an exception because the remote server went down and broke the connection. Only one of these calls should be 'handled'. Its easy to tell which. As can be seen in the script above, the second run shows wonky state: i.e. the region is OPEN though we were at the OPENING phase.

The SCP call to handleFailure ideally would break outstanding RPCs, if any, by interrupting them but Procedures and the RPC Dispatch are intentionally disconnected and run at their own speeds. Let me file a follow-on to add an interrupt to the RemoteDispatch Interface. There is none.

Meantime, here's a patch that will eat and log handleFailiures that come in with unexpected state. Only needed when we assign. The unassign failure handling (remoteCallFailed) works differently deferring to SCP always; if a stuck RPC happens on unassign, we already log and eat it:       LOG.info("Ignoring; waiting on ServerCrashProcedure", exception);

While in here, code reading, I noticed we set state to offline before we go to the AM to ask it undo the OPENING. Seems wrong. Changed order which  means some code path triggers now as it looks like it was supposed too but I think it could have side effects so this is 2.1.0 only.

> STUCK RIT though region successfully assigned
> ---------------------------------------------
>
>                 Key: HBASE-20796
>                 URL: https://issues.apache.org/jira/browse/HBASE-20796
>             Project: HBase
>          Issue Type: Bug
>          Components: amv2
>            Reporter: stack
>            Priority: Major
>             Fix For: 2.0.0
>
>
> This is a good one. We keep logging messages like this:
> {code}
> 2018-06-26 12:32:24,859 WARN org.apache.hadoop.hbase.master.assignment.AssignmentManager: STUCK Region-In-Transition rit=OPENING, location=vd0410.X.Y.com,22101,1529611445046, table=IntegrationTestBigLinkedList_20180525080406, region=e10b35d49528e2453a04c7038e3393d7
> {code}
> ...though the region is successfully assigned.
> Story:
>  * Dispatch an assign 2018-06-26 12:31:27,390 INFO org.apache.hadoop.hbase.master.assignment.RegionTransitionProcedure: Dispatch pid=370829, ppid=370391, state=RUNNABLE:REGION_TRANSITION_DISPATCH; AssignProcedure table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2; rit=OPENING, location=vd0410.X.Y.Z,22101,1529611445046
>  * It gets stuck 2018-06-26 12:32:29,860 WARN org.apache.hadoop.hbase.master.assignment.AssignmentManager: STUCK Region-In-Transition rit=OPENING, location=vd0410.X.Y.Z,22101,1529611445046, table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2 (Because the server was killed)
>  * We stay STUCK for a while.
>  * The Master notices the server as crashed and starts a SCP.
>  * SCP kills ongoing assign: 2018-06-26 12:32:54,809 INFO org.apache.hadoop.hbase.master.procedure.ServerCrashProcedure: pid=371105 found RIT pid=370829, ppid=370391, state=RUNNABLE:REGION_TRANSITION_DISPATCH; AssignProcedure table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2; rit=OPENING, location=vd0410.X.Y.Z,22101,1529611445046
>  * The kill brings on a retry ... 2018-06-26 12:32:54,810 WARN org.apache.hadoop.hbase.master.assignment.RegionTransitionProcedure: Remote call failed pid=370829, ppid=370391, state=RUNNABLE:REGION_TRANSITION_DISPATCH; AssignProcedure table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2; rit=OPENING, location=vd0410.X.Y.Z,22101,1529611445046; exception=ServerCrashProcedure pid=371105, server=vd0410.X.Y.Z,22101,1529611445046
>  * Which eventually succeeds..... Successfully deployed to new server 2018-06-26 12:32:55,429 INFO org.apache.hadoop.hbase.procedure2.ProcedureExecutor: Finished pid=370829, ppid=370391, state=SUCCESS; AssignProcedure table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2 in 1mins, 35.379sec
>  * But then, it looks like the RPC was ongoing and it broke in following way 2018-06-26 12:33:06,378 WARN org.apache.hadoop.hbase.master.assignment.RegionTransitionProcedure: Remote call failed pid=370829, ppid=370391, state=SUCCESS; AssignProcedure table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2; rit=OPEN, location=vc0614.halxg.cloudera.com,22101,1529611443424; exception=Call to vd0410.X.Y.Z/10.10.10.10:22101 failed on local exception: org.apache.hbase.thirdparty.io.netty.channel.unix.Errors$NativeIoException: syscall:read(..) failed: Connection reset by peer (Notice how state for region is OPEN and 'SUCCESS').
>  * Then says 2018-06-26 12:33:06,380 INFO org.apache.hadoop.hbase.master.assignment.AssignProcedure: Retry=1 of max=10; pid=370829, ppid=370391, state=SUCCESS; AssignProcedure table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2; rit=OPEN, location=vc0614.X.Y.Z,22101,1529611443424
>  * And finally...  2018-06-26 12:34:10,727 WARN org.apache.hadoop.hbase.master.assignment.AssignmentManager: STUCK Region-In-Transition rit=OFFLINE, location=null, table=IntegrationTestBigLinkedList_20180612114844, region=f69ccf7d9178ce166b515e0e2ef019d2
> Restart of Master got rid of the STUCK complaints.
> This is interesting because the stuck rpc and the successful reassign are all riding on the same pid.



--