[jira] [Comment Edited] (FALCON-1686) Support for reprocessing
[ https://issues.apache.org/jira/browse/FALCON-1686?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15069538#comment-15069538 ]
Ajay Yadava edited comment on FALCON-1686 at 12/23/15 11:45 AM:
----------------------------------------------------------------
This is the use case which I was talking about. You want to reprocess the data which was already processed by the old code, this should be solved by the *effective time update* feature.
>From what I understand [~sriksun] is talking about another use case. That is the case when you run your process and figure out that the code is correct but you have missed some instances because of incorrect start date. In this case you want *new instances* for a time range earlier than the start time and need to update start date of your process to an earlier time. This is also a valid use case but won't be solved by effective time update feature.
was (Author: ajayyadava):
I think this is the use case which I was talking about. You want to reprocess the instances which were already processed by the old code, this should be solved by the *effective time update* feature.
>From what I understand Srikanth Sundarrajan is talking about another use case. That is the case when you run your process and figure out that the code is correct but you have missed some instances because of incorrect start date. In this case you want *new instances* for a time range earlier than the start time and need to update start date of your process to an earlier time. This is also a valid use case but won't be solved by effective time update feature.
> Support for reprocessing
> ------------------------
>
> Key: FALCON-1686
> URL: https://issues.apache.org/jira/browse/FALCON-1686
> Project: Falcon
> Issue Type: Improvement
> Affects Versions: 0.7
> Reporter: Mass Dosage
>
> We have a number of ETL jobs which we schedule to run on a regular basis with Falcon. This works fine. However, we often have cases where we need to run the exact same jobs over past date ranges in order to reprocess data after a code change. There doesn't seem to be any easy way to do this in Falcon at the moment. Ideally we'd have a controlled way of saying "run this process for dates between X and Y". There should also be a way to control whether downstream processes are triggered by the data being reprocessed or not. In some cases you may want downstream jobs to also run on the new data but in other cases you might not.
> With Oozie, if one wants to reprocess data from any time in history, one can update the start & end-dates (using the job.properties file) and submit a new coordinator to run alongside the existing one. As the coordinator-ids are unique they do not clash. In Falcon, processes are defined by their readable name so one would need to update that in the process file directly.
> We are currently working around this issue by making a copy of the original Falcon process, giving it a different name and changing the dates. This isn't ideal and leads to a lot of XML duplication.
--