You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@geode.apache.org by "Fred Krone (JIRA)" <ji...@apache.org> on 2017/09/15 20:45:00 UTC

[jira] [Updated] (GEODE-3107) Improve gfsh export time when doing a snapshot

     [ https://issues.apache.org/jira/browse/GEODE-3107?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Fred Krone updated GEODE-3107:
------------------------------
    Fix Version/s: 1.3.0

> Improve gfsh export time when doing a snapshot
> ----------------------------------------------
>
>                 Key: GEODE-3107
>                 URL: https://issues.apache.org/jira/browse/GEODE-3107
>             Project: Geode
>          Issue Type: Sub-task
>          Components: snapshot
>    Affects Versions: 1.3.0
>            Reporter: Fred Krone
>            Assignee: Nick Reich
>              Labels: storage_1
>             Fix For: 1.3.0
>
>
> Currently a large snapshot puts a lot of pressure on the locator which needs to hold all keys and they do not get destroyed.
> Snapshot goes through the JMX manager but snapshots can also be parallelized and in theory this will probably improve performance.
> It would be useful to benchmark the current gfsh export time on 1 TB region and compare it with performance improvements from this ticket.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)