Re: How to add task time to a new invoice

Hi Hans:
It is not really clear how to do that. I get mired down chasing 
navigation links. Anyhow, I'll try creating a new time sheet with a 
through date before the end of the current month and see if that one 
shows up.
TIA
Ruth

Hans Bakker wrote:
> you can adjust the date to a later date before creating he invoice
>
> On Sun, 2010-01-31 at 17:40 -0500, Ruth Hoffman wrote:
>   
>> Hi Hans:
>> So, I shall check my timesheets for end dates relative to the current 
>> month (since I'm creating a new invoice)
>> Thanks again
>> Ruth
>>
>>
>> Hans Bakker wrote:
>>     
>>> Hi Ruth,
>>>
>>> when you create an invoice, you can set the end date which defaults to
>>> the end of the last month what normally should be ok for monthly
>>> billing...
>>>
>>> if your timesheets however are later....then they cannot be found.....
>>>
>>> Regards,
>>> Hans
>>>
>>>
>>> On Sun, 2010-01-31 at 17:30 -0500, Ruth Hoffman wrote:
>>>   
>>>       
>>>> Hi Hans:
>>>> Thanks for the quick reply!
>>>>
>>>> I thought that is how it might work. I tried this...and I get the 
>>>> following error: "No timeentry items found". This lead me to believe 
>>>> that I have to do something else besides
>>>>     create project -> create phase -> create task -> create timesheet -> 
>>>> set timesheet to complete
>>>>
>>>> Then when I bring up the "Billing" tab for my project I see "Hours not 
>>>> yet billed information" and my timesheets are all listed.
>>>>
>>>> When I go to "Add all reported/approved task time to a new invoice" I 
>>>> get that response.
>>>>
>>>> So, I think I'm missing something?
>>>> TIA
>>>> Ruth
>>>>
>>>> Hans Bakker wrote:
>>>>     
>>>>         
>>>>> timesheets have tasks...if you report on a task, the tasks are related
>>>>> to a project.
>>>>>
>>>>> you have to 'complete' the timesheet in order for it to appear in the
>>>>> project billing tab.
>>>>>
>>>>> Regards
>>>>> Hans
>>>>>
>>>>>
>>>>> On Sun, 2010-01-31 at 17:06 -0500, Ruth Hoffman wrote:
>>>>>   
>>>>>       
>>>>>           
>>>>>> Quick question about the Project Manager application:
>>>>>>
>>>>>> How does one associate timesheets with projects?
>>>>>>
>>>>>> I see where I can "Add all reported/approved task time to a new invoice" 
>>>>>> but how do I get a task "approved". And how do I associate the timesheet 
>>>>>> (which I am assuming is the "task time") with a project?
>>>>>>
>>>>>> TIA
>>>>>> Ruth
>>>>>>     
>>>>>>         
>>>>>>             

Re: How to add task time to a new invoice

Posted by Ruth Hoffman <rh...@aesolves.com>.
Hi Hans:
Yes - this is extremely useful and got me to the point where I could ask 
the question(s) I asked last night. In fact, that document has given me 
the confidence to say (to my client) "yes, this can be done".

Now, I'm left with putting together a demonstration such that I may walk 
through and show this person exactly how this would work from a 
consultant's point of view and from the business owner's point of view. 
So, when I asked how to get my timesheets associated with a project and 
then generate an invoice, this was from trying to use the Project 
Manager as a consultant would use it. There is nothing anywhere that I 
can find that describes the steps to accomplish this task. Certainly 
there is nothing that indicates that time sheets have to be dated a 
certain way to be eligible for inclusion in an invoice. And there is no 
indication anywhere of how to change dates on a time sheet to make them 
eligible for use when generating new invoices. I even looked at the form 
widget and cannot find this.

BTW, I haven't yet tried what you suggested last night. That's a task 
for later today.

Thanks for all your help. Your document and your suggestions posted on 
this list have saved me countless hours. Hopefully, we can work through 
the rest of this together and I'll have my demo (and the Wiki) 
documentation wrapped up soon.

Regards,
Ruth

Hans Bakker wrote:
> did you check:
> http://cwiki.apache.org/confluence/display/OFBENDUSER/OFBiz+in+a+service
> +and+project+oriented+company
>
> where it is all explained?
>
> Regards,
> Hans
>
> On Mon, 2010-02-01 at 08:30 -0500, Ruth Hoffman wrote:
>   
>> Hi Chris:
>> I was thinking that if I can get Hans to help me through this, I'd 
>> update the Wiki first with more detailed instructions.
>>
>> FYI - this is sort of a diversion from what I'm trying to finish up now: 
>> some basic accounting & marketing "how to" info in the E-Commerce OOTB 
>> book. But someone has asked me to demonstrate to them how one might use 
>> OFBiz within a Consulting/Software Product company. And, ever mindful of 
>> possible future training/book topics, I thought I'd give it a whirl.
>>
>> Thanks for the support!
>> ----------------------------------------------------
>> Find me on the web at http://www.myofbiz.com or Google keyword "myofbiz"
>> ruth.hoffman@myofbiz.com
>> Ruth
>> Christopher Snow wrote:
>>     
>>> Hi Ruth,
>>>
>>> When you have figured out how to use ofbiz for a consulting firm, will 
>>> you be including this in one of your books?  I would certainly like to 
>>> know how to do this, but without having to go through all the "pain" 
>>> that you have gone through!
>>>
>>> Many thanks,
>>>
>>> Chris
>>>
>>> Ruth Hoffman wrote:
>>>       
>>>> OK, can't do that because one already exist...plan "b", start all 
>>>> over new project, new timesheet.
>>>> TIA
>>>> Ruth
>>>>
>>>> Ruth Hoffman wrote:
>>>>         
>>>>> Hi Hans:
>>>>> It is not really clear how to do that. I get mired down chasing 
>>>>> navigation links. Anyhow, I'll try creating a new time sheet with a 
>>>>> through date before the end of the current month and see if that one 
>>>>> shows up.
>>>>> TIA
>>>>> Ruth
>>>>>
>>>>> Hans Bakker wrote:
>>>>>           
>>>>>> you can adjust the date to a later date before creating he invoice
>>>>>>
>>>>>> On Sun, 2010-01-31 at 17:40 -0500, Ruth Hoffman wrote:
>>>>>>  
>>>>>>             
>>>>>>> Hi Hans:
>>>>>>> So, I shall check my timesheets for end dates relative to the 
>>>>>>> current month (since I'm creating a new invoice)
>>>>>>> Thanks again
>>>>>>> Ruth
>>>>>>>
>>>>>>>
>>>>>>> Hans Bakker wrote:
>>>>>>>  
>>>>>>>               
>>>>>>>> Hi Ruth,
>>>>>>>>
>>>>>>>> when you create an invoice, you can set the end date which 
>>>>>>>> defaults to
>>>>>>>> the end of the last month what normally should be ok for monthly
>>>>>>>> billing...
>>>>>>>>
>>>>>>>> if your timesheets however are later....then they cannot be 
>>>>>>>> found.....
>>>>>>>>
>>>>>>>> Regards,
>>>>>>>> Hans
>>>>>>>>
>>>>>>>>
>>>>>>>> On Sun, 2010-01-31 at 17:30 -0500, Ruth Hoffman wrote:
>>>>>>>>      
>>>>>>>>                 
>>>>>>>>> Hi Hans:
>>>>>>>>> Thanks for the quick reply!
>>>>>>>>>
>>>>>>>>> I thought that is how it might work. I tried this...and I get 
>>>>>>>>> the following error: "No timeentry items found". This lead me to 
>>>>>>>>> believe that I have to do something else besides
>>>>>>>>>     create project -> create phase -> create task -> create 
>>>>>>>>> timesheet -> set timesheet to complete
>>>>>>>>>
>>>>>>>>> Then when I bring up the "Billing" tab for my project I see 
>>>>>>>>> "Hours not yet billed information" and my timesheets are all 
>>>>>>>>> listed.
>>>>>>>>>
>>>>>>>>> When I go to "Add all reported/approved task time to a new 
>>>>>>>>> invoice" I get that response.
>>>>>>>>>
>>>>>>>>> So, I think I'm missing something?
>>>>>>>>> TIA
>>>>>>>>> Ruth
>>>>>>>>>
>>>>>>>>> Hans Bakker wrote:
>>>>>>>>>          
>>>>>>>>>                   
>>>>>>>>>> timesheets have tasks...if you report on a task, the tasks are 
>>>>>>>>>> related
>>>>>>>>>> to a project.
>>>>>>>>>>
>>>>>>>>>> you have to 'complete' the timesheet in order for it to appear 
>>>>>>>>>> in the
>>>>>>>>>> project billing tab.
>>>>>>>>>>
>>>>>>>>>> Regards
>>>>>>>>>> Hans
>>>>>>>>>>
>>>>>>>>>>
>>>>>>>>>> On Sun, 2010-01-31 at 17:06 -0500, Ruth Hoffman wrote:
>>>>>>>>>>                
>>>>>>>>>>                     
>>>>>>>>>>> Quick question about the Project Manager application:
>>>>>>>>>>>
>>>>>>>>>>> How does one associate timesheets with projects?
>>>>>>>>>>>
>>>>>>>>>>> I see where I can "Add all reported/approved task time to a 
>>>>>>>>>>> new invoice" but how do I get a task "approved". And how do I 
>>>>>>>>>>> associate the timesheet (which I am assuming is the "task 
>>>>>>>>>>> time") with a project?
>>>>>>>>>>>
>>>>>>>>>>> TIA
>>>>>>>>>>> Ruth
>>>>>>>>>>>                         
>>>>>>>>>>>                       
>>>       

Re: How to add task time to a new invoice

Posted by Hans Bakker <ma...@antwebsystems.com>.
did you check:
http://cwiki.apache.org/confluence/display/OFBENDUSER/OFBiz+in+a+service
+and+project+oriented+company

where it is all explained?

Regards,
Hans

On Mon, 2010-02-01 at 08:30 -0500, Ruth Hoffman wrote:
> Hi Chris:
> I was thinking that if I can get Hans to help me through this, I'd 
> update the Wiki first with more detailed instructions.
> 
> FYI - this is sort of a diversion from what I'm trying to finish up now: 
> some basic accounting & marketing "how to" info in the E-Commerce OOTB 
> book. But someone has asked me to demonstrate to them how one might use 
> OFBiz within a Consulting/Software Product company. And, ever mindful of 
> possible future training/book topics, I thought I'd give it a whirl.
> 
> Thanks for the support!
> ----------------------------------------------------
> Find me on the web at http://www.myofbiz.com or Google keyword "myofbiz"
> ruth.hoffman@myofbiz.com
> Ruth
> Christopher Snow wrote:
> > Hi Ruth,
> >
> > When you have figured out how to use ofbiz for a consulting firm, will 
> > you be including this in one of your books?  I would certainly like to 
> > know how to do this, but without having to go through all the "pain" 
> > that you have gone through!
> >
> > Many thanks,
> >
> > Chris
> >
> > Ruth Hoffman wrote:
> >> OK, can't do that because one already exist...plan "b", start all 
> >> over new project, new timesheet.
> >> TIA
> >> Ruth
> >>
> >> Ruth Hoffman wrote:
> >>> Hi Hans:
> >>> It is not really clear how to do that. I get mired down chasing 
> >>> navigation links. Anyhow, I'll try creating a new time sheet with a 
> >>> through date before the end of the current month and see if that one 
> >>> shows up.
> >>> TIA
> >>> Ruth
> >>>
> >>> Hans Bakker wrote:
> >>>> you can adjust the date to a later date before creating he invoice
> >>>>
> >>>> On Sun, 2010-01-31 at 17:40 -0500, Ruth Hoffman wrote:
> >>>>  
> >>>>> Hi Hans:
> >>>>> So, I shall check my timesheets for end dates relative to the 
> >>>>> current month (since I'm creating a new invoice)
> >>>>> Thanks again
> >>>>> Ruth
> >>>>>
> >>>>>
> >>>>> Hans Bakker wrote:
> >>>>>  
> >>>>>> Hi Ruth,
> >>>>>>
> >>>>>> when you create an invoice, you can set the end date which 
> >>>>>> defaults to
> >>>>>> the end of the last month what normally should be ok for monthly
> >>>>>> billing...
> >>>>>>
> >>>>>> if your timesheets however are later....then they cannot be 
> >>>>>> found.....
> >>>>>>
> >>>>>> Regards,
> >>>>>> Hans
> >>>>>>
> >>>>>>
> >>>>>> On Sun, 2010-01-31 at 17:30 -0500, Ruth Hoffman wrote:
> >>>>>>      
> >>>>>>> Hi Hans:
> >>>>>>> Thanks for the quick reply!
> >>>>>>>
> >>>>>>> I thought that is how it might work. I tried this...and I get 
> >>>>>>> the following error: "No timeentry items found". This lead me to 
> >>>>>>> believe that I have to do something else besides
> >>>>>>>     create project -> create phase -> create task -> create 
> >>>>>>> timesheet -> set timesheet to complete
> >>>>>>>
> >>>>>>> Then when I bring up the "Billing" tab for my project I see 
> >>>>>>> "Hours not yet billed information" and my timesheets are all 
> >>>>>>> listed.
> >>>>>>>
> >>>>>>> When I go to "Add all reported/approved task time to a new 
> >>>>>>> invoice" I get that response.
> >>>>>>>
> >>>>>>> So, I think I'm missing something?
> >>>>>>> TIA
> >>>>>>> Ruth
> >>>>>>>
> >>>>>>> Hans Bakker wrote:
> >>>>>>>          
> >>>>>>>> timesheets have tasks...if you report on a task, the tasks are 
> >>>>>>>> related
> >>>>>>>> to a project.
> >>>>>>>>
> >>>>>>>> you have to 'complete' the timesheet in order for it to appear 
> >>>>>>>> in the
> >>>>>>>> project billing tab.
> >>>>>>>>
> >>>>>>>> Regards
> >>>>>>>> Hans
> >>>>>>>>
> >>>>>>>>
> >>>>>>>> On Sun, 2010-01-31 at 17:06 -0500, Ruth Hoffman wrote:
> >>>>>>>>                
> >>>>>>>>> Quick question about the Project Manager application:
> >>>>>>>>>
> >>>>>>>>> How does one associate timesheets with projects?
> >>>>>>>>>
> >>>>>>>>> I see where I can "Add all reported/approved task time to a 
> >>>>>>>>> new invoice" but how do I get a task "approved". And how do I 
> >>>>>>>>> associate the timesheet (which I am assuming is the "task 
> >>>>>>>>> time") with a project?
> >>>>>>>>>
> >>>>>>>>> TIA
> >>>>>>>>> Ruth
> >>>>>>>>>                         
> >>>
> >
> >
-- 
Antwebsystems.com: Quality OFBiz services for competitive rates


Re: How to add task time to a new invoice

Posted by Ruth Hoffman <rh...@aesolves.com>.
Hi Chris:
I was thinking that if I can get Hans to help me through this, I'd 
update the Wiki first with more detailed instructions.

FYI - this is sort of a diversion from what I'm trying to finish up now: 
some basic accounting & marketing "how to" info in the E-Commerce OOTB 
book. But someone has asked me to demonstrate to them how one might use 
OFBiz within a Consulting/Software Product company. And, ever mindful of 
possible future training/book topics, I thought I'd give it a whirl.

Thanks for the support!
----------------------------------------------------
Find me on the web at http://www.myofbiz.com or Google keyword "myofbiz"
ruth.hoffman@myofbiz.com
Ruth
Christopher Snow wrote:
> Hi Ruth,
>
> When you have figured out how to use ofbiz for a consulting firm, will 
> you be including this in one of your books?  I would certainly like to 
> know how to do this, but without having to go through all the "pain" 
> that you have gone through!
>
> Many thanks,
>
> Chris
>
> Ruth Hoffman wrote:
>> OK, can't do that because one already exist...plan "b", start all 
>> over new project, new timesheet.
>> TIA
>> Ruth
>>
>> Ruth Hoffman wrote:
>>> Hi Hans:
>>> It is not really clear how to do that. I get mired down chasing 
>>> navigation links. Anyhow, I'll try creating a new time sheet with a 
>>> through date before the end of the current month and see if that one 
>>> shows up.
>>> TIA
>>> Ruth
>>>
>>> Hans Bakker wrote:
>>>> you can adjust the date to a later date before creating he invoice
>>>>
>>>> On Sun, 2010-01-31 at 17:40 -0500, Ruth Hoffman wrote:
>>>>  
>>>>> Hi Hans:
>>>>> So, I shall check my timesheets for end dates relative to the 
>>>>> current month (since I'm creating a new invoice)
>>>>> Thanks again
>>>>> Ruth
>>>>>
>>>>>
>>>>> Hans Bakker wrote:
>>>>>  
>>>>>> Hi Ruth,
>>>>>>
>>>>>> when you create an invoice, you can set the end date which 
>>>>>> defaults to
>>>>>> the end of the last month what normally should be ok for monthly
>>>>>> billing...
>>>>>>
>>>>>> if your timesheets however are later....then they cannot be 
>>>>>> found.....
>>>>>>
>>>>>> Regards,
>>>>>> Hans
>>>>>>
>>>>>>
>>>>>> On Sun, 2010-01-31 at 17:30 -0500, Ruth Hoffman wrote:
>>>>>>      
>>>>>>> Hi Hans:
>>>>>>> Thanks for the quick reply!
>>>>>>>
>>>>>>> I thought that is how it might work. I tried this...and I get 
>>>>>>> the following error: "No timeentry items found". This lead me to 
>>>>>>> believe that I have to do something else besides
>>>>>>>     create project -> create phase -> create task -> create 
>>>>>>> timesheet -> set timesheet to complete
>>>>>>>
>>>>>>> Then when I bring up the "Billing" tab for my project I see 
>>>>>>> "Hours not yet billed information" and my timesheets are all 
>>>>>>> listed.
>>>>>>>
>>>>>>> When I go to "Add all reported/approved task time to a new 
>>>>>>> invoice" I get that response.
>>>>>>>
>>>>>>> So, I think I'm missing something?
>>>>>>> TIA
>>>>>>> Ruth
>>>>>>>
>>>>>>> Hans Bakker wrote:
>>>>>>>          
>>>>>>>> timesheets have tasks...if you report on a task, the tasks are 
>>>>>>>> related
>>>>>>>> to a project.
>>>>>>>>
>>>>>>>> you have to 'complete' the timesheet in order for it to appear 
>>>>>>>> in the
>>>>>>>> project billing tab.
>>>>>>>>
>>>>>>>> Regards
>>>>>>>> Hans
>>>>>>>>
>>>>>>>>
>>>>>>>> On Sun, 2010-01-31 at 17:06 -0500, Ruth Hoffman wrote:
>>>>>>>>                
>>>>>>>>> Quick question about the Project Manager application:
>>>>>>>>>
>>>>>>>>> How does one associate timesheets with projects?
>>>>>>>>>
>>>>>>>>> I see where I can "Add all reported/approved task time to a 
>>>>>>>>> new invoice" but how do I get a task "approved". And how do I 
>>>>>>>>> associate the timesheet (which I am assuming is the "task 
>>>>>>>>> time") with a project?
>>>>>>>>>
>>>>>>>>> TIA
>>>>>>>>> Ruth
>>>>>>>>>                         
>>>
>
>

Re: How to add task time to a new invoice

Posted by Christopher Snow <sn...@snowconsulting.co.uk>.
Hi Ruth,

When you have figured out how to use ofbiz for a consulting firm, will 
you be including this in one of your books?  I would certainly like to 
know how to do this, but without having to go through all the "pain" 
that you have gone through!

Many thanks,

Chris

Ruth Hoffman wrote:
> OK, can't do that because one already exist...plan "b", start all over 
> new project, new timesheet.
> TIA
> Ruth
>
> Ruth Hoffman wrote:
>> Hi Hans:
>> It is not really clear how to do that. I get mired down chasing 
>> navigation links. Anyhow, I'll try creating a new time sheet with a 
>> through date before the end of the current month and see if that one 
>> shows up.
>> TIA
>> Ruth
>>
>> Hans Bakker wrote:
>>> you can adjust the date to a later date before creating he invoice
>>>
>>> On Sun, 2010-01-31 at 17:40 -0500, Ruth Hoffman wrote:
>>>  
>>>> Hi Hans:
>>>> So, I shall check my timesheets for end dates relative to the 
>>>> current month (since I'm creating a new invoice)
>>>> Thanks again
>>>> Ruth
>>>>
>>>>
>>>> Hans Bakker wrote:
>>>>   
>>>>> Hi Ruth,
>>>>>
>>>>> when you create an invoice, you can set the end date which 
>>>>> defaults to
>>>>> the end of the last month what normally should be ok for monthly
>>>>> billing...
>>>>>
>>>>> if your timesheets however are later....then they cannot be 
>>>>> found.....
>>>>>
>>>>> Regards,
>>>>> Hans
>>>>>
>>>>>
>>>>> On Sun, 2010-01-31 at 17:30 -0500, Ruth Hoffman wrote:
>>>>>       
>>>>>> Hi Hans:
>>>>>> Thanks for the quick reply!
>>>>>>
>>>>>> I thought that is how it might work. I tried this...and I get the 
>>>>>> following error: "No timeentry items found". This lead me to 
>>>>>> believe that I have to do something else besides
>>>>>>     create project -> create phase -> create task -> create 
>>>>>> timesheet -> set timesheet to complete
>>>>>>
>>>>>> Then when I bring up the "Billing" tab for my project I see 
>>>>>> "Hours not yet billed information" and my timesheets are all listed.
>>>>>>
>>>>>> When I go to "Add all reported/approved task time to a new 
>>>>>> invoice" I get that response.
>>>>>>
>>>>>> So, I think I'm missing something?
>>>>>> TIA
>>>>>> Ruth
>>>>>>
>>>>>> Hans Bakker wrote:
>>>>>>           
>>>>>>> timesheets have tasks...if you report on a task, the tasks are 
>>>>>>> related
>>>>>>> to a project.
>>>>>>>
>>>>>>> you have to 'complete' the timesheet in order for it to appear 
>>>>>>> in the
>>>>>>> project billing tab.
>>>>>>>
>>>>>>> Regards
>>>>>>> Hans
>>>>>>>
>>>>>>>
>>>>>>> On Sun, 2010-01-31 at 17:06 -0500, Ruth Hoffman wrote:
>>>>>>>                 
>>>>>>>> Quick question about the Project Manager application:
>>>>>>>>
>>>>>>>> How does one associate timesheets with projects?
>>>>>>>>
>>>>>>>> I see where I can "Add all reported/approved task time to a new 
>>>>>>>> invoice" but how do I get a task "approved". And how do I 
>>>>>>>> associate the timesheet (which I am assuming is the "task 
>>>>>>>> time") with a project?
>>>>>>>>
>>>>>>>> TIA
>>>>>>>> Ruth
>>>>>>>>                         
>>


Re: How to add task time to a new invoice

Posted by Ruth Hoffman <rh...@aesolves.com>.
OK, can't do that because one already exist...plan "b", start all over 
new project, new timesheet.
TIA
Ruth

Ruth Hoffman wrote:
> Hi Hans:
> It is not really clear how to do that. I get mired down chasing 
> navigation links. Anyhow, I'll try creating a new time sheet with a 
> through date before the end of the current month and see if that one 
> shows up.
> TIA
> Ruth
>
> Hans Bakker wrote:
>> you can adjust the date to a later date before creating he invoice
>>
>> On Sun, 2010-01-31 at 17:40 -0500, Ruth Hoffman wrote:
>>  
>>> Hi Hans:
>>> So, I shall check my timesheets for end dates relative to the 
>>> current month (since I'm creating a new invoice)
>>> Thanks again
>>> Ruth
>>>
>>>
>>> Hans Bakker wrote:
>>>    
>>>> Hi Ruth,
>>>>
>>>> when you create an invoice, you can set the end date which defaults to
>>>> the end of the last month what normally should be ok for monthly
>>>> billing...
>>>>
>>>> if your timesheets however are later....then they cannot be found.....
>>>>
>>>> Regards,
>>>> Hans
>>>>
>>>>
>>>> On Sun, 2010-01-31 at 17:30 -0500, Ruth Hoffman wrote:
>>>>        
>>>>> Hi Hans:
>>>>> Thanks for the quick reply!
>>>>>
>>>>> I thought that is how it might work. I tried this...and I get the 
>>>>> following error: "No timeentry items found". This lead me to 
>>>>> believe that I have to do something else besides
>>>>>     create project -> create phase -> create task -> create 
>>>>> timesheet -> set timesheet to complete
>>>>>
>>>>> Then when I bring up the "Billing" tab for my project I see "Hours 
>>>>> not yet billed information" and my timesheets are all listed.
>>>>>
>>>>> When I go to "Add all reported/approved task time to a new 
>>>>> invoice" I get that response.
>>>>>
>>>>> So, I think I'm missing something?
>>>>> TIA
>>>>> Ruth
>>>>>
>>>>> Hans Bakker wrote:
>>>>>            
>>>>>> timesheets have tasks...if you report on a task, the tasks are 
>>>>>> related
>>>>>> to a project.
>>>>>>
>>>>>> you have to 'complete' the timesheet in order for it to appear in 
>>>>>> the
>>>>>> project billing tab.
>>>>>>
>>>>>> Regards
>>>>>> Hans
>>>>>>
>>>>>>
>>>>>> On Sun, 2010-01-31 at 17:06 -0500, Ruth Hoffman wrote:
>>>>>>                  
>>>>>>> Quick question about the Project Manager application:
>>>>>>>
>>>>>>> How does one associate timesheets with projects?
>>>>>>>
>>>>>>> I see where I can "Add all reported/approved task time to a new 
>>>>>>> invoice" but how do I get a task "approved". And how do I 
>>>>>>> associate the timesheet (which I am assuming is the "task time") 
>>>>>>> with a project?
>>>>>>>
>>>>>>> TIA
>>>>>>> Ruth
>>>>>>>                         
>