You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "ASF GitHub Bot (Jira)" <ji...@apache.org> on 2023/03/09 15:18:00 UTC

[jira] [Updated] (FLINK-31385) Introduce extended Assertj Matchers for completable futures

     [ https://issues.apache.org/jira/browse/FLINK-31385?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

ASF GitHub Bot updated FLINK-31385:
-----------------------------------
    Labels: pull-request-available  (was: )

> Introduce extended Assertj Matchers for completable futures
> -----------------------------------------------------------
>
>                 Key: FLINK-31385
>                 URL: https://issues.apache.org/jira/browse/FLINK-31385
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Tests
>            Reporter: David Morávek
>            Assignee: David Morávek
>            Priority: Minor
>              Labels: pull-request-available
>
> Introduce extended Assertj Matchers for completable futures that don't rely on timeouts.
> In general, we want to avoid relying on timeouts in the Flink test suite to get additional context (thread dump) in case something gets stuck.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)