You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Sean Busbey (Jira)" <ji...@apache.org> on 2019/11/13 03:56:00 UTC
[jira] [Created] (HBASE-23283) Provide clear and consistent logging
about the period of enabled chores
Sean Busbey created HBASE-23283:
-----------------------------------
Summary: Provide clear and consistent logging about the period of enabled chores
Key: HBASE-23283
URL: https://issues.apache.org/jira/browse/HBASE-23283
Project: HBase
Issue Type: Task
Components: Operability
Affects Versions: 3.0.0, 2.3.0, 1.7.0
Reporter: Sean Busbey
Similar to HBASE-23038, we should always log info about our enabled chores. Right now wether or not we get some information is up to particular Chore constructors and by and large we don't get any log messages when things can get started, even if the period is something impossibly long (e.g. 3000 days).
When we go to schedule the chore here:
{code}
if (chore.getPeriod() <= 0) {
LOG.info("The period is {} seconds, {} is disabled", chore.getPeriod(), chore.getName());
return false;
}
{code}
we should add an else clause that says it's enabled. It looks like we could then just call chore.toString to get the proper details about the chore and its period.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)