You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hbase.apache.org by "Duo Zhang (Jira)" <ji...@apache.org> on 2021/03/01 06:19:00 UTC
[jira] [Resolved] (HBASE-25620) Increase timeout value for pre
commit
[ https://issues.apache.org/jira/browse/HBASE-25620?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Duo Zhang resolved HBASE-25620.
-------------------------------
Fix Version/s: 2.4.2
2.3.5
2.5.0
3.0.0-alpha-1
Hadoop Flags: Reviewed
Resolution: Fixed
Pushed to branch-2.3+.
Thanks [~zghao] for reviewing.
> Increase timeout value for pre commit
> -------------------------------------
>
> Key: HBASE-25620
> URL: https://issues.apache.org/jira/browse/HBASE-25620
> Project: HBase
> Issue Type: Task
> Components: build, test
> Reporter: Duo Zhang
> Assignee: Duo Zhang
> Priority: Major
> Fix For: 3.0.0-alpha-1, 2.5.0, 2.3.5, 2.4.2
>
>
> A full jdk8 build on our pre commit machines still can not finish within 7 hours after upgrading to the newest jdk8. Let's increase the timeout value for now.
> Later we could see if it is possible to make the tests run faster, by set reuseForks to true or something.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)