You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Gyula Fora (Jira)" <ji...@apache.org> on 2022/03/29 15:54:00 UTC
[jira] [Assigned] (FLINK-26916) The Operator ignores job related changes (jar, parallelism) during last-state upgrades
[ https://issues.apache.org/jira/browse/FLINK-26916?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Gyula Fora reassigned FLINK-26916:
----------------------------------
Assignee: Gyula Fora
> The Operator ignores job related changes (jar, parallelism) during last-state upgrades
> --------------------------------------------------------------------------------------
>
> Key: FLINK-26916
> URL: https://issues.apache.org/jira/browse/FLINK-26916
> Project: Flink
> Issue Type: Bug
> Components: Kubernetes Operator
> Affects Versions: kubernetes-operator-0.1.0, kubernetes-operator-1.0.0
> Reporter: Matyas Orhidi
> Assignee: Gyula Fora
> Priority: Critical
>
> RC: The old jobgraph is being reused when resuming
--
This message was sent by Atlassian Jira
(v8.20.1#820001)