You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@calcite.apache.org by "Andrei Sereda (JIRA)" <ji...@apache.org> on 2019/03/18 16:38:00 UTC

[jira] [Assigned] (CALCITE-2457) Upgrade to JUnit 5

     [ https://issues.apache.org/jira/browse/CALCITE-2457?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Andrei Sereda reassigned CALCITE-2457:
--------------------------------------

    Assignee: Andrei Sereda

> Upgrade to JUnit 5
> ------------------
>
>                 Key: CALCITE-2457
>                 URL: https://issues.apache.org/jira/browse/CALCITE-2457
>             Project: Calcite
>          Issue Type: Improvement
>            Reporter: Vladimir Sitnikov
>            Assignee: Andrei Sereda
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: assert_equals.png, truth_assertmap.png
>
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> JUnit 5 brings multiple useful features so tests are easier to read and write.
> Is there something that blocks upgrading to JUnit 5?
> By upgrade I mean bumping up the dependency version and creating new tests with JUnit 5 features.
> Relevant features of JUnit 5: dynamic test, nested tests, parameterized tests
> https://twitter.com/nipafx/status/1027095088059559936



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)