You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Nick Dimiduk (Jira)" <ji...@apache.org> on 2020/08/07 23:59:00 UTC
[jira] [Updated] (HBASE-24835) Normalizer should log a successful
run at INFO level
[ https://issues.apache.org/jira/browse/HBASE-24835?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Nick Dimiduk updated HBASE-24835:
---------------------------------
Status: Patch Available (was: Open)
> Normalizer should log a successful run at INFO level
> ----------------------------------------------------
>
> Key: HBASE-24835
> URL: https://issues.apache.org/jira/browse/HBASE-24835
> Project: HBase
> Issue Type: Task
> Components: Normalizer
> Affects Versions: 3.0.0-alpha-1
> Reporter: Nick Dimiduk
> Assignee: Nick Dimiduk
> Priority: Minor
>
> A successful or uneventful Normalizer run gives no indication that it ran at INFO level. I'm thinking a simple summary message like "Normalizer ran successfully in T. Submitted X plans across Y tables."
--
This message was sent by Atlassian Jira
(v8.3.4#803005)