You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@tez.apache.org by "Bikas Saha (JIRA)" <ji...@apache.org> on 2014/02/16 04:57:19 UTC
[jira] [Commented] (TEZ-823) Add DAGs with a vertex conecting with
2 downstream/upstream vertices and unit tests for fault tolerance on these
DAGs
[ https://issues.apache.org/jira/browse/TEZ-823?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13902632#comment-13902632 ]
Bikas Saha commented on TEZ-823:
--------------------------------
testInputFailureRerunCanSendOutputToTwoDownstreamVertices
In this test v3 is passing using the outputs generated by first attempt of the tasks of v1. I think we should change v3 to fail inputs like v2. Then both v3 and v2 will wait for inputs to be regenerated. This will also cover the case that multiple consumer vertices report failure against same producer task.
> Add DAGs with a vertex conecting with 2 downstream/upstream vertices and unit tests for fault tolerance on these DAGs
> ---------------------------------------------------------------------------------------------------------------------
>
> Key: TEZ-823
> URL: https://issues.apache.org/jira/browse/TEZ-823
> Project: Apache Tez
> Issue Type: Sub-task
> Affects Versions: 0.3.0
> Reporter: Tassapol Athiapinya
> Assignee: Tassapol Athiapinya
> Fix For: 0.2.0
>
> Attachments: TEZ-823.1.patch
>
>
> So far we test fault tolerance on a vertex with 1 upstream/downstream vertex. We should test scenarios when a vertex is connected with more than 1 upstream/downstream vertices
--
This message was sent by Atlassian JIRA
(v6.1.5#6160)