You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@samza.apache.org by "Yan Fang (JIRA)" <ji...@apache.org> on 2014/09/02 20:22:22 UTC
[jira] [Created] (SAMZA-401) Add utilization metrics for the event
loop
Yan Fang created SAMZA-401:
------------------------------
Summary: Add utilization metrics for the event loop
Key: SAMZA-401
URL: https://issues.apache.org/jira/browse/SAMZA-401
Project: Samza
Issue Type: Improvement
Reporter: Yan Fang
As discussed [here|https://issues.apache.org/jira/browse/SAMZA-349?focusedCommentId=14116417&page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel#comment-14116417],
{quote}
it would be useful to add "utilization" (aka "duty cycle") as a metric, which is the sum of all the timings divided by the window length. That can tell you how much idle time there is in the event loop (how much headroom before the job will start falling behind).
{quote}
It is useful to add this metric for the event loop.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)