You are viewing a plain text version of this content. The canonical link for it is here.
Posted to commits@jmeter.apache.org by fs...@apache.org on 2016/11/01 09:47:10 UTC
svn commit: r1767460 [3/3] - in /jmeter/trunk:
docs/images/screenshots/logic-controller/interleave-controller.png
docs/images/screenshots/mailreader_sampler.png
docs/usermanual/component_reference.html xdocs/usermanual/get-started.xml
Modified: jmeter/trunk/xdocs/usermanual/get-started.xml
URL: http://svn.apache.org/viewvc/jmeter/trunk/xdocs/usermanual/get-started.xml?rev=1767460&r1=1767459&r2=1767460&view=diff
==============================================================================
--- jmeter/trunk/xdocs/usermanual/get-started.xml (original)
+++ jmeter/trunk/xdocs/usermanual/get-started.xml Tue Nov 1 09:47:10 2016
@@ -54,7 +54,7 @@ The first step is to configure the injec
<ul>
<li>Correct machine sizing in terms of CPU, memory and network</li>
<li>OS Tuning</li>
- <li>Java setup: Ensure you install the last version of Java supported by JMeter</li>
+ <li>Java setup: Ensure you install the latest version of Java supported by JMeter</li>
<li><b>Correct sizing of Java Heap</b>. By default JMeter runs with a heap of 512MB, this might not be enough for your test and depends on your test plan and number of threads you want to run</li>
</ul>
@@ -111,8 +111,8 @@ over your Test Plans.</p>
<p>JMeter requires that your computing environment meets some minimum requirements.</p>
<subsection name="§-num;.1.1 Java Version" anchor="java_versions">
-<note>JMeter requires a fully compliant JVM 7 or 8, we advise that you install last minor version of those major versions.
-Java 9 is not tested completely as of JMeter 3.1.
+<note>JMeter requires a fully compliant JVM 7 or 8, we advise that you install latest minor version of those major versions.
+Java 9 is not tested completely as of JMeter 3.1.
</note>
<p>Because JMeter uses only standard Java APIs, please do not file bug reports if your JRE fails to run
JMeter because of JRE implementation issues.</p>