You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@flink.apache.org by "Jark Wu (JIRA)" <ji...@apache.org> on 2019/08/02 06:35:00 UTC
[jira] [Assigned] (FLINK-13494) Blink planner changes source
parallelism which causes stream SQL e2e test fails
[ https://issues.apache.org/jira/browse/FLINK-13494?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Jark Wu reassigned FLINK-13494:
-------------------------------
Assignee: XuPingyong (was: Jark Wu)
> Blink planner changes source parallelism which causes stream SQL e2e test fails
> -------------------------------------------------------------------------------
>
> Key: FLINK-13494
> URL: https://issues.apache.org/jira/browse/FLINK-13494
> Project: Flink
> Issue Type: Bug
> Components: Table SQL / Planner, Tests
> Affects Versions: 1.9.0, 1.10.0
> Reporter: Zhenghua Gao
> Assignee: XuPingyong
> Priority: Blocker
> Labels: pull-request-available
> Fix For: 1.9.0
>
> Time Spent: 10m
> Remaining Estimate: 0h
>
--
This message was sent by Atlassian JIRA
(v7.6.14#76016)