You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@bahir.apache.org by "João Boto (Jira)" <ji...@apache.org> on 2021/12/26 19:00:00 UTC
[jira] [Resolved] (BAHIR-294) Update log4j2 version to 2.15.0
[ https://issues.apache.org/jira/browse/BAHIR-294?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
João Boto resolved BAHIR-294.
-----------------------------
Fix Version/s: (was: Spark-2.4.0)
Resolution: Fixed
> Update log4j2 version to 2.15.0
> -------------------------------
>
> Key: BAHIR-294
> URL: https://issues.apache.org/jira/browse/BAHIR-294
> Project: Bahir
> Issue Type: Improvement
> Components: Build, Flink Streaming Connectors, Spark SQL Data Sources, Spark Streaming Connectors, Spark Structured Streaming Connectors, Website
> Affects Versions: Spark-2.3.0, Flink-1.0
> Reporter: haoqi
> Assignee: João Boto
> Priority: Major
> Fix For: Flink-Next
>
>
> 2.0 <= Apache log4j2 <= 2.14.1 have a RCE zero day.
>
> [https://www.cyberkendra.com/2021/12/worst-log4j-rce-zeroday-dropped-on.html|https://www.cyberkendra.com/2021/12/worst-log4j-rce-zeroday-dropped-on.htmlhttps://www.lunasec.io/docs/blog/log4j-zero-day/]
>
> [https://www.lunasec.io/docs/blog/log4j-zero-day/|https://www.cyberkendra.com/2021/12/worst-log4j-rce-zeroday-dropped-on.htmlhttps://www.lunasec.io/docs/blog/log4j-zero-day/]
--
This message was sent by Atlassian Jira
(v8.20.1#820001)