Posted to dev@geronimo.apache.org by Matt Hogstrom <ma...@hogstrom.org> on 2005/10/13 19:49:06 UTC

Poll...1.0 for Apache Con - Feature request

All,

I sent an e-mail out about a week ago on what people thought about getting 
Geronimo 1.0 out for Apache Con coming up in December.  I've heard back from a 
few folks and the feedback has been generally positive.  There are a lot of 
things we'd like to get done in terms of new feature / function and if we wait 
until Geronimo is complete with all the cool stuff it will be a while before we 
cut a 1.0 branch.

I think it would be sweet to finish this year out by saying we hit a 1.0 release 
and Apache Con seems to be a good point to make the announcement.  So the 
question is what do we need to get done to say 1.0 is ready?

So to kick off the discussion here we go ...

I included a brief calender below of the time we have between now and Apache Con 
to try and figure out how much gas there was to get things done.  I figure we 
have a little over 3 weeks to get our work done before we cut a branch and start 
testing / verifying it.  I assumed that Thanksgiving week would be a bust for 
most people so I took it out of the available time.  That leaves about three 
weeks for CTS testing and resolving issues.  Thoughts on whether this makes any 
sense or not?  I wrote my thoughts on what I figured was important for us in 
terms of users accepting the server and using it.  Not sure how to get these 
things done and I expect I'm missing a ton of things.

Let the adventure begin...

Feature list for 1.0

Console - focus on ensuring console is functional
Statement cache in TranQL - Improve JDBC performance
Installer for Geronimo (allow for selection of Web Container :)
Performance testing and fixes
Testing for stability
Usability (testing deploy of apps and customer experience)
DayTrader face lift and documentation

- Matt

October

+-----+-----+-----+-----+-----+-----+-----+
| Sun |     |     |     |     |     | Sat |
|     |     |     |     |  13 |  14 |  15 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+
| Sun |     |     |     |     |     | Sat |
|  16 | 17  |  18 |  19 |  20 |  21 |  22 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+
| Sun |     |     |     |     |     | Sat |
|  23 | 24  |  25 |  26 |  27 |  28 |  29 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+
| Sun |     |     |     |     |     | Sat |
|  30 | 31  |     |     |     |     |     |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+


November

+-----+-----+-----+-----+-----+-----+-----+
|     |     |     |     |     |     | Sat |
|     |     |   1 |   2 |   3 |  4  |  5  |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+

Cut 1.0 Branch on 11/7 and begin CTS testing
+-----+-----+-----+-----+-----+-----+-----+
| Sun |     |     |     |     |     | Sat |
|   6 |  7  |   8 |   9 |  10 |  11 |  12 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+
|     |     |     |     |     |     |     |
|  13 | 14  |  15 |  16 |  17 |  18 |  19 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+

Next week is Thanksgiving.
I figure its a blackout week.
+-----+-----+-----+-----+-----+-----+-----+
|||||||||||||||||||||||||||||||||||||||||||
|  20 | 21  |  22 |  23 |  24 |  25 |  26 |
|||||||||||||||||||||||||||||||||||||||||||
+-----+-----+-----+-----+-----+-----+-----+
|     |     |     |     |     |     |     |
|  27 | 28  |  29 |  30 |     |     |     |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+


December

12/2 - CTS Tested and Verified 1.0 ready

+-----+-----+-----+-----+-----+-----+-----+
|     |     |     |     |     |     | Sat |
|     |     |     |     |   1 |  2  |  3  |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+

12/10 - Apache Con Begins

+-----+-----+-----+-----+-----+-----+-----+
| Sun |     |     |     |     |     | Sat |
|   4 |  5  |   6 |   7 |   8 |   9 |  10 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+
|     |     |     |     |     |     |     |
|  11 | 12  |  13 |  14 |  15 |  18 |  19 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+
|     |     |     |     |     |     |     |
|  20 | 21  |  22 |  23 |  24 |  25 |  26 |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+
|     |     |     |     |     |     |     |
|  27 | 28  |  29 |  30 |     |     |     |
|     |     |     |     |     |     |     |
+-----+-----+-----+-----+-----+-----+-----+


Re: Poll...1.0 for Apache Con - Feature request

Posted by Jeff Genender <jg...@savoirtech.com>.

Bruce Snyder wrote:
> On 10/17/05, Kresten Krab Thorup <kr...@trifork.com> wrote:
> 
> 
>>Integration with the CORBA stuff would indeed take several weeks; and
>>then after that we need to grind it through the TCK.  So I don't
>>think we can finish all this before the proposed cut-off 3 weeks from
>>now.
>>
>>I've been down with pneumonia for the last 3+ weeks, so things have
>>been at a standstill here with regards to new development.  Today is
>>my first day back to work, and I'm preparing for OSCON in Amsterdam
>>tomorrow.  I'm looking forward to meet some of you!
> 
> ...
> 
>>>Bruce Snyder wrote:
> 
> ...
> 
>>>>>Let the adventure begin...
>>>>>
>>>>>Feature list for 1.0
>>>>>
>>>>>Console - focus on ensuring console is functional
>>>>>Statement cache in TranQL - Improve JDBC performance
>>>>>Installer for Geronimo (allow for selection of Web Container :)
>>>>>Performance testing and fixes
>>>>>Testing for stability
>>>>>Usability (testing deploy of apps and customer experience)
>>>>>DayTrader face lift and documentation
>>>>>
>>>>
>>>>What's the status of the interop/ORB stuff?
> 
> 
> I don't speak for everyone, certainly, but I know I've heard a number
> of people agree that using the Sun ORB is not sufficient for the 1.0
> release so I'm interested in getting the TriFork stuff into the hands
> of the community sooner rather than later. Kresten, this would also
> allow you to begin to discuss the integration work with the rest of
> the community in an effort to get it ready for the 1.0 release we're
> discussing in this thread. Is it possible for TriFork to commit the
> CORBA stuff to the sandbox so that the community can begin to take a
> look at it?

+1 from me...I would definately like to start eye-balling the code. 
The sooner we can start looking at it, the sooner we can get prepared to 
use it.

Jeff

> 
> Bruce
> --
> perl -e 'print unpack("u30","D0G)U8V4\@4VYY9&5R\"F)R=6-E+G-N>61E<D\!G;6%I;\"YC;VT*"
> );'
> 
> The Castor Project
> http://www.castor.org/
> 
> Apache Geronimo
> http://geronimo.apache.org/

Re: Poll...1.0 for Apache Con - Feature request

Posted by Bruce Snyder <br...@gmail.com>.
On 10/17/05, Kresten Krab Thorup <kr...@trifork.com> wrote:

> Integration with the CORBA stuff would indeed take several weeks; and
> then after that we need to grind it through the TCK.  So I don't
> think we can finish all this before the proposed cut-off 3 weeks from
> now.
>
> I've been down with pneumonia for the last 3+ weeks, so things have
> been at a standstill here with regards to new development.  Today is
> my first day back to work, and I'm preparing for OSCON in Amsterdam
> tomorrow.  I'm looking forward to meet some of you!
...
> > Bruce Snyder wrote:
...
> >>> Let the adventure begin...
> >>>
> >>> Feature list for 1.0
> >>>
> >>> Console - focus on ensuring console is functional
> >>> Statement cache in TranQL - Improve JDBC performance
> >>> Installer for Geronimo (allow for selection of Web Container :)
> >>> Performance testing and fixes
> >>> Testing for stability
> >>> Usability (testing deploy of apps and customer experience)
> >>> DayTrader face lift and documentation
> >>>
> >> What's the status of the interop/ORB stuff?

I don't speak for everyone, certainly, but I know I've heard a number
of people agree that using the Sun ORB is not sufficient for the 1.0
release so I'm interested in getting the TriFork stuff into the hands
of the community sooner rather than later. Kresten, this would also
allow you to begin to discuss the integration work with the rest of
the community in an effort to get it ready for the 1.0 release we're
discussing in this thread. Is it possible for TriFork to commit the
CORBA stuff to the sandbox so that the community can begin to take a
look at it?

Bruce
--
perl -e 'print unpack("u30","D0G)U8V4\@4VYY9&5R\"F)R=6-E+G-N>61E<D\!G;6%I;\"YC;VT*"
);'

The Castor Project
http://www.castor.org/

Apache Geronimo
http://geronimo.apache.org/

Re: Poll...1.0 for Apache Con - Feature request

Posted by Kresten Krab Thorup <kr...@trifork.com>.
Hi there.

Integration with the CORBA stuff would indeed take several weeks; and  
then after that we need to grind it through the TCK.  So I don't  
think we can finish all this before the proposed cut-off 3 weeks from  
now.

I've been down with pneumonia for the last 3+ weeks, so things have  
been at a standstill here with regards to new development.  Today is  
my first day back to work, and I'm preparing for OSCON in Amsterdam  
tomorrow.  I'm looking forward to meet some of you!

Kresten Krab Thorup
krab@trifork.com

"We do not inherit the Earth from our parents, we borrow it from our  
children." Saint Exupery



On Oct 14, 2005, at 4:34 AM, Matt Hogstrom wrote:

> Trifork has been silent for a few weeks.  I think at this point the  
> integration work would require several weeks but I'm probably not  
> the best person to estimate the time.
>
> Perhaps the Trifork folks can comment.   Anyone ?
>
> Bruce Snyder wrote:
>
>> On 10/13/05, Matt Hogstrom <ma...@hogstrom.org> wrote:
>>
>>> I sent an e-mail out about a week ago on what people thought  
>>> about getting
>>> Geronimo 1.0 out for Apache Con coming up in December.  I've  
>>> heard back from a
>>> few folks and the feedback has been generally positive.  There  
>>> are a lot of
>>> things we'd like to get done in terms of new feature / function  
>>> and if we wait
>>> until Geronimo is complete with all the cool stuff it will be a  
>>> while before we
>>> cut a 1.0 branch.
>>>
>>> I think it would be sweet to finish this year out by saying we  
>>> hit a 1.0 release
>>> and Apache Con seems to be a good point to make the  
>>> announcement.  So the
>>> question is what do we need to get done to say 1.0 is ready?
>>>
>>> So to kick off the discussion here we go ...
>>>
>>> I included a brief calender below of the time we have between now  
>>> and Apache Con
>>> to try and figure out how much gas there was to get things done.   
>>> I figure we
>>> have a little over 3 weeks to get our work done before we cut a  
>>> branch and start
>>> testing / verifying it.  I assumed that Thanksgiving week would  
>>> be a bust for
>>> most people so I took it out of the available time.  That leaves  
>>> about three
>>> weeks for CTS testing and resolving issues.  Thoughts on whether  
>>> this makes any
>>> sense or not?  I wrote my thoughts on what I figured was  
>>> important for us in
>>> terms of users accepting the server and using it.  Not sure how  
>>> to get these
>>> things done and I expect I'm missing a ton of things.
>>>
>>> Let the adventure begin...
>>>
>>> Feature list for 1.0
>>>
>>> Console - focus on ensuring console is functional
>>> Statement cache in TranQL - Improve JDBC performance
>>> Installer for Geronimo (allow for selection of Web Container :)
>>> Performance testing and fixes
>>> Testing for stability
>>> Usability (testing deploy of apps and customer experience)
>>> DayTrader face lift and documentation
>>>
>> What's the status of the interop/ORB stuff?
>> Bruce
>> --
>> perl -e 'print unpack("u30","D0G)U8V4\@4VYY9&5R\"F)R=6-E+G-N>61E<D 
>> \!G;6%I;\"YC;VT*"
>> );'
>> The Castor Project
>> http://www.castor.org/
>> Apache Geronimo
>> http://geronimo.apache.org/
>>
>
>


Re: Poll...1.0 for Apache Con - Feature request

Posted by Matt Hogstrom <ma...@hogstrom.org>.
Trifork has been silent for a few weeks.  I think at this point the integration 
work would require several weeks but I'm probably not the best person to 
estimate the time.

Perhaps the Trifork folks can comment.   Anyone ?

Bruce Snyder wrote:
> On 10/13/05, Matt Hogstrom <ma...@hogstrom.org> wrote:
> 
> 
>>I sent an e-mail out about a week ago on what people thought about getting
>>Geronimo 1.0 out for Apache Con coming up in December.  I've heard back from a
>>few folks and the feedback has been generally positive.  There are a lot of
>>things we'd like to get done in terms of new feature / function and if we wait
>>until Geronimo is complete with all the cool stuff it will be a while before we
>>cut a 1.0 branch.
>>
>>I think it would be sweet to finish this year out by saying we hit a 1.0 release
>>and Apache Con seems to be a good point to make the announcement.  So the
>>question is what do we need to get done to say 1.0 is ready?
>>
>>So to kick off the discussion here we go ...
>>
>>I included a brief calender below of the time we have between now and Apache Con
>>to try and figure out how much gas there was to get things done.  I figure we
>>have a little over 3 weeks to get our work done before we cut a branch and start
>>testing / verifying it.  I assumed that Thanksgiving week would be a bust for
>>most people so I took it out of the available time.  That leaves about three
>>weeks for CTS testing and resolving issues.  Thoughts on whether this makes any
>>sense or not?  I wrote my thoughts on what I figured was important for us in
>>terms of users accepting the server and using it.  Not sure how to get these
>>things done and I expect I'm missing a ton of things.
>>
>>Let the adventure begin...
>>
>>Feature list for 1.0
>>
>>Console - focus on ensuring console is functional
>>Statement cache in TranQL - Improve JDBC performance
>>Installer for Geronimo (allow for selection of Web Container :)
>>Performance testing and fixes
>>Testing for stability
>>Usability (testing deploy of apps and customer experience)
>>DayTrader face lift and documentation
> 
> 
> What's the status of the interop/ORB stuff?
> 
> Bruce
> --
> perl -e 'print unpack("u30","D0G)U8V4\@4VYY9&5R\"F)R=6-E+G-N>61E<D\!G;6%I;\"YC;VT*"
> );'
> 
> The Castor Project
> http://www.castor.org/
> 
> Apache Geronimo
> http://geronimo.apache.org/
> 
> 
> 


Re: Poll...1.0 for Apache Con - Feature request

Posted by Bruce Snyder <br...@gmail.com>.
On 10/13/05, Matt Hogstrom <ma...@hogstrom.org> wrote:

> I sent an e-mail out about a week ago on what people thought about getting
> Geronimo 1.0 out for Apache Con coming up in December.  I've heard back from a
> few folks and the feedback has been generally positive.  There are a lot of
> things we'd like to get done in terms of new feature / function and if we wait
> until Geronimo is complete with all the cool stuff it will be a while before we
> cut a 1.0 branch.
>
> I think it would be sweet to finish this year out by saying we hit a 1.0 release
> and Apache Con seems to be a good point to make the announcement.  So the
> question is what do we need to get done to say 1.0 is ready?
>
> So to kick off the discussion here we go ...
>
> I included a brief calender below of the time we have between now and Apache Con
> to try and figure out how much gas there was to get things done.  I figure we
> have a little over 3 weeks to get our work done before we cut a branch and start
> testing / verifying it.  I assumed that Thanksgiving week would be a bust for
> most people so I took it out of the available time.  That leaves about three
> weeks for CTS testing and resolving issues.  Thoughts on whether this makes any
> sense or not?  I wrote my thoughts on what I figured was important for us in
> terms of users accepting the server and using it.  Not sure how to get these
> things done and I expect I'm missing a ton of things.
>
> Let the adventure begin...
>
> Feature list for 1.0
>
> Console - focus on ensuring console is functional
> Statement cache in TranQL - Improve JDBC performance
> Installer for Geronimo (allow for selection of Web Container :)
> Performance testing and fixes
> Testing for stability
> Usability (testing deploy of apps and customer experience)
> DayTrader face lift and documentation

What's the status of the interop/ORB stuff?

Bruce
--
perl -e 'print unpack("u30","D0G)U8V4\@4VYY9&5R\"F)R=6-E+G-N>61E<D\!G;6%I;\"YC;VT*"
);'

The Castor Project
http://www.castor.org/

Apache Geronimo
http://geronimo.apache.org/

Re: Poll...1.0 for Apache Con - Feature request

Posted by Matt Hogstrom <ma...@hogstrom.org>.
If you mean I can type with two fingers...sadly, your probably right ;-P

Dain Sundstrom wrote:
> +1 and sweet calendar... looks like you are management material ;)
> 
> -dain
> 
> On Oct 13, 2005, at 10:49 AM, Matt Hogstrom wrote:
> 
>> All,
>>
>> I sent an e-mail out about a week ago on what people thought about  
>> getting Geronimo 1.0 out for Apache Con coming up in December.   I've 
>> heard back from a few folks and the feedback has been  generally 
>> positive.  There are a lot of things we'd like to get  done in terms 
>> of new feature / function and if we wait until  Geronimo is complete 
>> with all the cool stuff it will be a while  before we cut a 1.0 branch.
>>
>> I think it would be sweet to finish this year out by saying we hit  a 
>> 1.0 release and Apache Con seems to be a good point to make the  
>> announcement.  So the question is what do we need to get done to  say 
>> 1.0 is ready?
>>
>> So to kick off the discussion here we go ...
>>
>> I included a brief calender below of the time we have between now  and 
>> Apache Con to try and figure out how much gas there was to get  things 
>> done.  I figure we have a little over 3 weeks to get our  work done 
>> before we cut a branch and start testing / verifying it.   I assumed 
>> that Thanksgiving week would be a bust for most people so  I took it 
>> out of the available time.  That leaves about three weeks  for CTS 
>> testing and resolving issues.  Thoughts on whether this  makes any 
>> sense or not?  I wrote my thoughts on what I figured was  important 
>> for us in terms of users accepting the server and using  it.  Not sure 
>> how to get these things done and I expect I'm missing  a ton of things.
>>
>> Let the adventure begin...
>>
>> Feature list for 1.0
>>
>> Console - focus on ensuring console is functional
>> Statement cache in TranQL - Improve JDBC performance
>> Installer for Geronimo (allow for selection of Web Container :)
>> Performance testing and fixes
>> Testing for stability
>> Usability (testing deploy of apps and customer experience)
>> DayTrader face lift and documentation
>>
>> - Matt
>>
>> October
>>
>> +-----+-----+-----+-----+-----+-----+-----+
>> | Sun |     |     |     |     |     | Sat |
>> |     |     |     |     |  13 |  14 |  15 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>> | Sun |     |     |     |     |     | Sat |
>> |  16 | 17  |  18 |  19 |  20 |  21 |  22 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>> | Sun |     |     |     |     |     | Sat |
>> |  23 | 24  |  25 |  26 |  27 |  28 |  29 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>> | Sun |     |     |     |     |     | Sat |
>> |  30 | 31  |     |     |     |     |     |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>>
>>
>> November
>>
>> +-----+-----+-----+-----+-----+-----+-----+
>> |     |     |     |     |     |     | Sat |
>> |     |     |   1 |   2 |   3 |  4  |  5  |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>>
>> Cut 1.0 Branch on 11/7 and begin CTS testing
>> +-----+-----+-----+-----+-----+-----+-----+
>> | Sun |     |     |     |     |     | Sat |
>> |   6 |  7  |   8 |   9 |  10 |  11 |  12 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>> |     |     |     |     |     |     |     |
>> |  13 | 14  |  15 |  16 |  17 |  18 |  19 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>>
>> Next week is Thanksgiving.
>> I figure its a blackout week.
>> +-----+-----+-----+-----+-----+-----+-----+
>> |||||||||||||||||||||||||||||||||||||||||||
>> |  20 | 21  |  22 |  23 |  24 |  25 |  26 |
>> |||||||||||||||||||||||||||||||||||||||||||
>> +-----+-----+-----+-----+-----+-----+-----+
>> |     |     |     |     |     |     |     |
>> |  27 | 28  |  29 |  30 |     |     |     |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>>
>>
>> December
>>
>> 12/2 - CTS Tested and Verified 1.0 ready
>>
>> +-----+-----+-----+-----+-----+-----+-----+
>> |     |     |     |     |     |     | Sat |
>> |     |     |     |     |   1 |  2  |  3  |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>>
>> 12/10 - Apache Con Begins
>>
>> +-----+-----+-----+-----+-----+-----+-----+
>> | Sun |     |     |     |     |     | Sat |
>> |   4 |  5  |   6 |   7 |   8 |   9 |  10 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>> |     |     |     |     |     |     |     |
>> |  11 | 12  |  13 |  14 |  15 |  18 |  19 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>> |     |     |     |     |     |     |     |
>> |  20 | 21  |  22 |  23 |  24 |  25 |  26 |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>> |     |     |     |     |     |     |     |
>> |  27 | 28  |  29 |  30 |     |     |     |
>> |     |     |     |     |     |     |     |
>> +-----+-----+-----+-----+-----+-----+-----+
>>
> 
> 
> 
> 


Re: Poll...1.0 for Apache Con - Feature request

Posted by Dain Sundstrom <da...@iq80.com>.
+1 and sweet calendar... looks like you are management material ;)

-dain

On Oct 13, 2005, at 10:49 AM, Matt Hogstrom wrote:

> All,
>
> I sent an e-mail out about a week ago on what people thought about  
> getting Geronimo 1.0 out for Apache Con coming up in December.   
> I've heard back from a few folks and the feedback has been  
> generally positive.  There are a lot of things we'd like to get  
> done in terms of new feature / function and if we wait until  
> Geronimo is complete with all the cool stuff it will be a while  
> before we cut a 1.0 branch.
>
> I think it would be sweet to finish this year out by saying we hit  
> a 1.0 release and Apache Con seems to be a good point to make the  
> announcement.  So the question is what do we need to get done to  
> say 1.0 is ready?
>
> So to kick off the discussion here we go ...
>
> I included a brief calender below of the time we have between now  
> and Apache Con to try and figure out how much gas there was to get  
> things done.  I figure we have a little over 3 weeks to get our  
> work done before we cut a branch and start testing / verifying it.   
> I assumed that Thanksgiving week would be a bust for most people so  
> I took it out of the available time.  That leaves about three weeks  
> for CTS testing and resolving issues.  Thoughts on whether this  
> makes any sense or not?  I wrote my thoughts on what I figured was  
> important for us in terms of users accepting the server and using  
> it.  Not sure how to get these things done and I expect I'm missing  
> a ton of things.
>
> Let the adventure begin...
>
> Feature list for 1.0
>
> Console - focus on ensuring console is functional
> Statement cache in TranQL - Improve JDBC performance
> Installer for Geronimo (allow for selection of Web Container :)
> Performance testing and fixes
> Testing for stability
> Usability (testing deploy of apps and customer experience)
> DayTrader face lift and documentation
>
> - Matt
>
> October
>
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |     |     |     |     |  13 |  14 |  15 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |  16 | 17  |  18 |  19 |  20 |  21 |  22 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |  23 | 24  |  25 |  26 |  27 |  28 |  29 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |  30 | 31  |     |     |     |     |     |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
>
> November
>
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     | Sat |
> |     |     |   1 |   2 |   3 |  4  |  5  |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
> Cut 1.0 Branch on 11/7 and begin CTS testing
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |   6 |  7  |   8 |   9 |  10 |  11 |  12 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  13 | 14  |  15 |  16 |  17 |  18 |  19 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
> Next week is Thanksgiving.
> I figure its a blackout week.
> +-----+-----+-----+-----+-----+-----+-----+
> |||||||||||||||||||||||||||||||||||||||||||
> |  20 | 21  |  22 |  23 |  24 |  25 |  26 |
> |||||||||||||||||||||||||||||||||||||||||||
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  27 | 28  |  29 |  30 |     |     |     |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
>
> December
>
> 12/2 - CTS Tested and Verified 1.0 ready
>
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     | Sat |
> |     |     |     |     |   1 |  2  |  3  |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
> 12/10 - Apache Con Begins
>
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |   4 |  5  |   6 |   7 |   8 |   9 |  10 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  11 | 12  |  13 |  14 |  15 |  18 |  19 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  20 | 21  |  22 |  23 |  24 |  25 |  26 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  27 | 28  |  29 |  30 |     |     |     |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>


Re: Poll...1.0 for Apache Con - Feature request

Posted by Aaron Mulder <am...@alumni.princeton.edu>.
+1 on the timeline.

I'd like to add "evaluate all bug reports in detail" to the list for
1.0.  Of course, there needs to be widespread agreement in order for
that to actually happen.  :)

Aaron

On 10/13/05, Matt Hogstrom <ma...@hogstrom.org> wrote:
> All,
>
> I sent an e-mail out about a week ago on what people thought about getting
> Geronimo 1.0 out for Apache Con coming up in December.  I've heard back from a
> few folks and the feedback has been generally positive.  There are a lot of
> things we'd like to get done in terms of new feature / function and if we wait
> until Geronimo is complete with all the cool stuff it will be a while before we
> cut a 1.0 branch.
>
> I think it would be sweet to finish this year out by saying we hit a 1.0 release
> and Apache Con seems to be a good point to make the announcement.  So the
> question is what do we need to get done to say 1.0 is ready?
>
> So to kick off the discussion here we go ...
>
> I included a brief calender below of the time we have between now and Apache Con
> to try and figure out how much gas there was to get things done.  I figure we
> have a little over 3 weeks to get our work done before we cut a branch and start
> testing / verifying it.  I assumed that Thanksgiving week would be a bust for
> most people so I took it out of the available time.  That leaves about three
> weeks for CTS testing and resolving issues.  Thoughts on whether this makes any
> sense or not?  I wrote my thoughts on what I figured was important for us in
> terms of users accepting the server and using it.  Not sure how to get these
> things done and I expect I'm missing a ton of things.
>
> Let the adventure begin...
>
> Feature list for 1.0
>
> Console - focus on ensuring console is functional
> Statement cache in TranQL - Improve JDBC performance
> Installer for Geronimo (allow for selection of Web Container :)
> Performance testing and fixes
> Testing for stability
> Usability (testing deploy of apps and customer experience)
> DayTrader face lift and documentation
>
> - Matt
>
> October
>
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |     |     |     |     |  13 |  14 |  15 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |  16 | 17  |  18 |  19 |  20 |  21 |  22 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |  23 | 24  |  25 |  26 |  27 |  28 |  29 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |  30 | 31  |     |     |     |     |     |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
>
> November
>
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     | Sat |
> |     |     |   1 |   2 |   3 |  4  |  5  |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
> Cut 1.0 Branch on 11/7 and begin CTS testing
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |   6 |  7  |   8 |   9 |  10 |  11 |  12 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  13 | 14  |  15 |  16 |  17 |  18 |  19 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
> Next week is Thanksgiving.
> I figure its a blackout week.
> +-----+-----+-----+-----+-----+-----+-----+
> |||||||||||||||||||||||||||||||||||||||||||
> |  20 | 21  |  22 |  23 |  24 |  25 |  26 |
> |||||||||||||||||||||||||||||||||||||||||||
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  27 | 28  |  29 |  30 |     |     |     |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
>
> December
>
> 12/2 - CTS Tested and Verified 1.0 ready
>
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     | Sat |
> |     |     |     |     |   1 |  2  |  3  |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
> 12/10 - Apache Con Begins
>
> +-----+-----+-----+-----+-----+-----+-----+
> | Sun |     |     |     |     |     | Sat |
> |   4 |  5  |   6 |   7 |   8 |   9 |  10 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  11 | 12  |  13 |  14 |  15 |  18 |  19 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  20 | 21  |  22 |  23 |  24 |  25 |  26 |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
> |     |     |     |     |     |     |     |
> |  27 | 28  |  29 |  30 |     |     |     |
> |     |     |     |     |     |     |     |
> +-----+-----+-----+-----+-----+-----+-----+
>
>