You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hive.apache.org by "mahesh kumar behera (JIRA)" <ji...@apache.org> on 2018/07/11 16:10:00 UTC
[jira] [Comment Edited] (HIVE-19829) Incremental replication load
should create tasks in execution phase rather than semantic phase
[ https://issues.apache.org/jira/browse/HIVE-19829?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16540295#comment-16540295 ]
mahesh kumar behera edited comment on HIVE-19829 at 7/11/18 4:09 PM:
---------------------------------------------------------------------
[~sankarh]
The extra code changes are for fixing the bug HIVE-20120 ..it will be commit this to master as part of HIVE-20120
was (Author: maheshk114):
[~sankarh]
The code changes are for HIVE-20120 ..i will commit this to master as part of HIVE-20120
> Incremental replication load should create tasks in execution phase rather than semantic phase
> ----------------------------------------------------------------------------------------------
>
> Key: HIVE-19829
> URL: https://issues.apache.org/jira/browse/HIVE-19829
> Project: Hive
> Issue Type: Task
> Components: repl
> Affects Versions: 3.1.0, 4.0.0
> Reporter: mahesh kumar behera
> Assignee: mahesh kumar behera
> Priority: Major
> Labels: pull-request-available
> Fix For: 4.0.0
>
> Attachments: HIVE-19829.01.patch, HIVE-19829.02.patch, HIVE-19829.03.patch, HIVE-19829.04.patch, HIVE-19829.06.patch, HIVE-19829.07.patch, HIVE-19829.07.patch, HIVE-19829.08-branch-3.patch, HIVE-19829.08.patch, HIVE-19829.09.patch, HIVE-19829.10-branch-3.patch, HIVE-19829.10.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create number of tasks equal to the configured value.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)