You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@camel.apache.org by "Guillaume Nodet (Jira)" <ji...@apache.org> on 2026/07/04 16:42:00 UTC

[jira] [Updated] (CAMEL-23899) Flaky test: LogWriterRollOverUpdateAsyncWithContentionTest in camel-wal

     [ https://issues.apache.org/jira/browse/CAMEL-23899?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Guillaume Nodet updated CAMEL-23899:
------------------------------------
    Fix Version/s: 4.22.0

> Flaky test: LogWriterRollOverUpdateAsyncWithContentionTest in camel-wal
> -----------------------------------------------------------------------
>
>                 Key: CAMEL-23899
>                 URL: https://issues.apache.org/jira/browse/CAMEL-23899
>             Project: Camel
>          Issue Type: Bug
>            Reporter: Guillaume Nodet
>            Priority: Major
>              Labels: flaky-test
>             Fix For: 4.22.0
>
>
> The test `LogWriterRollOverUpdateAsyncWithContentionTest.testReadWriteUpdateRecordsWithRollOver` in `camel-wal` is flaky in CI.
> Observed failure on JDK 17 in PR #24374 CI run (July 4, 2025). The test involves concurrent write-ahead log operations with contention and roll-over, which is timing-sensitive.
> The test should be stabilized, potentially using Awaitility instead of any timing-dependent assertions.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)