You are viewing a plain text version of this content. The canonical link for it is here.
Posted to oak-issues@jackrabbit.apache.org by "Davide Giannella (JIRA)" <ji...@apache.org> on 2017/05/30 08:39:19 UTC

[jira] [Closed] (OAK-5605) Speed up time to cancel revision GC

     [ https://issues.apache.org/jira/browse/OAK-5605?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Davide Giannella closed OAK-5605.
---------------------------------

Bulk close for 1.7.0

> Speed up time to cancel revision GC
> -----------------------------------
>
>                 Key: OAK-5605
>                 URL: https://issues.apache.org/jira/browse/OAK-5605
>             Project: Jackrabbit Oak
>          Issue Type: Improvement
>          Components: core, documentmk
>            Reporter: Marcel Reutegger
>            Assignee: Marcel Reutegger
>            Priority: Minor
>             Fix For: 1.7.0, 1.8
>
>
> OAK-4915 introduced a method to cancel the Revision GC on a DocumentNodeStore. The implementation does not wait for the Revision GC to stop, but simply sets a flag. In some cases the Revision GC still runs for some time even when canceled. This issue is about reducing the time it takes to actually cancel the Revision GC.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)