You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@hive.apache.org by "Jesus Camacho Rodriguez (JIRA)" <ji...@apache.org> on 2018/10/19 23:33:00 UTC

[jira] [Created] (HIVE-20783) Factor reduction in cost by DPP when costing SJ reduction

Jesus Camacho Rodriguez created HIVE-20783:
----------------------------------------------

             Summary: Factor reduction in cost by DPP when costing SJ reduction
                 Key: HIVE-20783
                 URL: https://issues.apache.org/jira/browse/HIVE-20783
             Project: Hive
          Issue Type: Bug
          Components: Physical Optimizer
            Reporter: Jesus Camacho Rodriguez
            Assignee: Jesus Camacho Rodriguez


Currently, while costing the SJ in a plan, the stats of the a TS that is reduced by a SJ are not adjusted after we have decided to keep a SJ in the tree. Ideally, we could adjust the stats to take into account decisions that have already been made.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)