You are viewing a plain text version of this content. The canonical link for it is here.
Posted to dev@drill.apache.org by "Neeraja (JIRA)" <ji...@apache.org> on 2015/01/19 19:24:34 UTC

[jira] [Created] (DRILL-2035) Add ability to cancel multiple queries

Neeraja created DRILL-2035:
------------------------------

             Summary: Add ability to cancel multiple queries
                 Key: DRILL-2035
                 URL: https://issues.apache.org/jira/browse/DRILL-2035
             Project: Apache Drill
          Issue Type: Bug
            Reporter: Neeraja
             Fix For: 0.8.0


Currently Drill UI allows canceling one query at a time.
This could be cumbersome to manage for scenarios using with BI tools which generate multiple queries for a single action in the UI.





--
This message was sent by Atlassian JIRA
(v6.3.4#6332)