You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@ambari.apache.org by "Jonathan Hurley (JIRA)" <ji...@apache.org> on 2017/07/09 22:16:00 UTC
[jira] [Created] (AMBARI-21432) Allow BI stack services to be
stopped as a part of the upgrade pack
Jonathan Hurley created AMBARI-21432:
----------------------------------------
Summary: Allow BI stack services to be stopped as a part of the upgrade pack
Key: AMBARI-21432
URL: https://issues.apache.org/jira/browse/AMBARI-21432
Project: Ambari
Issue Type: Bug
Affects Versions: 2.5.2
Reporter: Jonathan Hurley
Assignee: Jonathan Hurley
Priority: Blocker
Fix For: 2.5.2
With stack features allowed to co-exist for cross stack upgrade, once AMBARI-21430 is completed we should be able to do Stop All services from the upgrade pack.
This will allow EU to look seamless and similar to any intra-stack upgrade with pre-checks and stop enabled.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)