You are viewing a plain text version of this content. The canonical link for it is here.
Posted to yarn-issues@hadoop.apache.org by "Sandy Ryza (JIRA)" <ji...@apache.org> on 2014/08/15 02:13:18 UTC
[jira] [Commented] (YARN-2420) Fair Scheduler: dynamically update
yarn.scheduler.fair.max.assign based on cluster load
[ https://issues.apache.org/jira/browse/YARN-2420?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14097961#comment-14097961 ]
Sandy Ryza commented on YARN-2420:
----------------------------------
Cool.
Regarding adjusting maxassign dynamically, my view has been that this isn't needed when continuous scheduling is turned on, and eventually we expect everyone to switch over to continuous scheduling. Thoughts?
> Fair Scheduler: dynamically update yarn.scheduler.fair.max.assign based on cluster load
> ---------------------------------------------------------------------------------------
>
> Key: YARN-2420
> URL: https://issues.apache.org/jira/browse/YARN-2420
> Project: Hadoop YARN
> Issue Type: Improvement
> Reporter: Wei Yan
> Assignee: Wei Yan
> Priority: Minor
>
--
This message was sent by Atlassian JIRA
(v6.2#6252)