You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@hbase.apache.org by "Lars Hofhansl (JIRA)" <ji...@apache.org> on 2013/01/26 07:39:13 UTC
[jira] [Created] (HBASE-7681) Increase timeouts in some more
test...?
Lars Hofhansl created HBASE-7681:
------------------------------------
Summary: Increase timeouts in some more test...?
Key: HBASE-7681
URL: https://issues.apache.org/jira/browse/HBASE-7681
Project: HBase
Issue Type: Bug
Reporter: Lars Hofhansl
Fix For: 0.94.5
I've seen many unspecific test failures recently that cannot be reproduced locally even when running these test is a loop for a very long time.
Many of these test one way or the other make assumption w.r.t. wall clock time. While I cannot fix that, an option to increase some of these timeout a bit.
This issue is to remind me to do that.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira