You are viewing a plain text version of this content. The canonical link for it is here.
Posted to issues@nifi.apache.org by "r65535 (Jira)" <ji...@apache.org> on 2020/11/13 13:37:00 UTC
[jira] [Assigned] (NIFI-7982) Add Run Duration option to
FlattanJSON processor
[ https://issues.apache.org/jira/browse/NIFI-7982?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
r65535 reassigned NIFI-7982:
----------------------------
Assignee: r65535
> Add Run Duration option to FlattanJSON processor
> ------------------------------------------------
>
> Key: NIFI-7982
> URL: https://issues.apache.org/jira/browse/NIFI-7982
> Project: Apache NiFi
> Issue Type: Improvement
> Components: Extensions
> Reporter: Rahul Soni
> Assignee: r65535
> Priority: Major
>
> FlattenJSON processor doesn't have a run duration today. As a result, the flows using it sometimes needs to assign more threads to the processor for a higher throughput, which is not an ideal scenario. In order to yield maximum throughput from FlattenJSON processor, I would propose adding Run Duration option to the scheduling section.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)